805721
61
Zoom out
Zoom in
Previous page
1/72
Next page
en
61
InstallationIndications, functions and optionsMessages Commissioning Operation and function
If priority PRIO 0 is adjusted and the switch-on conditions for both stores are
fullled, the stores are loaded in parallel (Arr 6) or in store sequence control (Arr
4, 5) respectively, beginning with the store with the lowest temperature. In store
sequence control, solar loading will switch from one store to the other in steps of
5 K [10 °Ra] temperature difference between the stores.
If PRIO 1 / 2 is adjusted, store sequence control will be activated (see below) with
the corresponding store as the priority store.
Note
If the priority is set to PRIO Su 1 or Su 2, solar loading of the subordi-
nate store will be stopped at once if the temperature in the priority store
(store 1 for Su 1, store 2 for Su 2) falls below the adjusted maximum tem-
perature. If, in that case, the temperature difference between the priority
store and the collector is not sufciently high, solar loading will be stopped
completely.
Spreaded loading temperature difference
(only available if PRIO is set to SE 1 or SE 2)
DTSE
Temperature difference spreaded loading
Adjustment range: 20 … 90 K [40 … 160 °Ra]
Factory setting: 40 K [70 °Ra]
Store sequence control (only available if priority is set to PRIO SE 1, SE 2, 1 or 2)
tLB
Loading break store sequence control
Adjustment range: 1 30 min
Factory setting: 2 min
tRUN
Circulation runtime store sequence control
Adjustment range: 1 30 min
Factory setting: 15 min
Store sequence control will be activated when PRIO is set to SE 1, SE 2, 1 or 2.
If the priority store cannot be loaded, the subordinate store will be checked. If use-
ful heat can be added to the subordinate store, it will be loaded for the circulation
time (tRUN – factory setting 15 min). After this, the loading process stops and the
controller monitors the increase in collector temperature during the loading break
time tLB. If it increases by 2 K [4° Ra], the break time timer starts again to allow
the collector to gain more heat. If the collector temperature does not increase suf-
ciently, the subordinate store will be loaded again for the tRUN runtime as before.
As soon as the switch-on condition of the priority store is fullled, it will be loaded.
If the switch-on condition of the priority store is not fullled, loading of the subor-
dinate store will be continued. If the priority store reaches its maximum tempera-
ture, store sequence control will not be carried out.
If store sequence control is active and the system switches to load the priority
store, the parameter tLB also acts as a stabilisation time, during which the switch-
off condition DT F is ignored while the system operation is stabilising.
61


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Sol Plus at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Sol Plus in the language / languages: English as an attachment in your email.

The manual is 3.79 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Remeha Sol Plus

Remeha Sol Plus User Manual - German - 72 pages

Remeha Sol Plus User Manual - Dutch - 72 pages

Remeha Sol Plus User Manual - French - 72 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info