815509
16
Zoom out
Zoom in
Previous page
1/64
Next page
1616 3-90-30007474Vermont Castings • Intrepid DV-IFT Owner’s Manual_R28 • 11/23
Secure the Vent Sections
Vertical sections of SLP pipe must be supported every 8 feet.
The SLP restop includes tabs that may be used to secure
vertical sections.
The vent support or plumber’s strap (spaced 120° apart) may
be used to secure the vertical sections of pipe, Figure 3.5.
Horizontal sections of vent must be supported every 5 feet
with a vent support or plumber’s strap, Figure 3.6.
Figure 3.4 - Screws into Slip Section
WARNING
!
RiskofFire/Explosion/Asphyxiation! Improper support
may allow vent to sag and separate. Use vent run supports
and connect vent sections per installation instructions. DO
NOT allow vent to sag below connection point to appliance.
Figure 3.5 - Securing Vertical Pipe Sections
DisassembleVentSections:
To disassemble any two pieces of pipe, rotate either section,
Figure 3.7, so that the seams on both pipe sections are
aligned, Figure 3.8. They can then be carefully pulled apart.
Figure 3.7 - Rotate Seams for Disassembly
Figure 3.8 - Align and Disassemble Vent Sections
Figure 3.6 - Securing Horizontal Pipe Sections
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Vermont Castings Intrepid - Gas at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Vermont Castings Intrepid - Gas in the language / languages: English as an attachment in your email.

The manual is 17.23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info