8437
31
Zoom out
Zoom in
Previous page
1/36
Next page
31
Fig. 21 N - V controller, boiler with 7 and 9 sections
Fig. 22 N - V controller, boiler with 11 to 19 sections
16. Switch the boiler to full load by selecting option
"Load maximum" with the ' ' button and confirming it
with the ' ' button.
Compare the CO
2
percentage with the value men
tioned in the table. Adjust, if necessary, this CO
2
percentage with the V-controller. Switch the boiler to
part load, measure and compare the CO
2
percentage
with the value mentioned in the table and adjust, if
necessary, the value with the N-controller.
17. Repeat this full load/part load switching until the CO
2
percentages at full load/part load come within the
tolerances mentioned in the table.
18. By pressing the ' ' button, the main menu of the
service level reappears. Now set the desired boiler
control, as described in para. 7.3.3.
By pressing the ' ' button three times, you return to
the main menu of the user level.
19. After commissioning, enter the preset values in the
table on the boiler.
20. Send the CE commissioning report to Broag.
11.3 Shut down the boiler
1. Turn off the power supply to the boiler.
2. Close the main gas cock.
3. Turn off the boiler control.
Please note! Frost protection may be required.
12. FAULT-FINDING
- Now select the option “History data” with the ' ' button
and confirm it with the ' ' button.
- Now select the lock out or shut down failure memory
using the ' ' button. Confirm with the ' ' button.
Depending on the option selected, the number of
locking failures stored in the memory (maximum 5 of
each) is now displayed.
Failure No. 1 is the failure which occurred last, failure
No. 2 the last but one, etc.
To know which failure occurred last, the failure counter
must be set to 1 using the ' ' and ' ' buttons. When the
' ' button is pressed for confirmation, the failure in
question is indicated. Using the ' ' button, various
menus can now be called up, all indicating the opera-
tional condition of the boiler at the moment of failure.
In the table below the various failure messages are dis-
played which may appear on the LCD-display, followed by
the instructions to eliminate the failure.
For possible measurement methods see chapter 11:
"Commissioning". When a failure message appears that
is not selfexplanitory, and is not displayed in the table,
then contact our service department.
Note:
When reporting a failure code, write down the exact mes-
sage and the parameters at which the failure occured.
12.1 General
For troubleshooting use the wiring diagram and the swit-
ching sequence diagram in paragraph 10.9. The instru-
ment panel is provided with an alphanumeric LCD-display.
In the case of failure, the display indicates the cause of
the failure and how long ago the boiler went into failure
mode. The failure and the operating condition at the time
of failure are stored in the memory of the control unit.
Five blocking and five locking failures can be stored in
this memory. If a failure in a boiler repeats itself several
times in rapid succession, this failure is stored only once.
Locking failures can be reset using the reset button on
the instrument panel (' ').
12.2 Faults
In the case of failure, the LCD-display indicates the cause
of the failure. It also indicates whether it is a blocking or
locking failure and how long ago it occurred. In the case
of a blocking failure, the boiler will automatically restart
when the cause of the failure has been eliminated. If the
same blocking failure has occurred 5 times in rapid suc-
cession, the boiler will lock out. Displaying the operational
condition at the time when the failure occurred speeds up
the search for the cause of failure.
Proceed as follows:
- Select the service level by travelling down the user
menus using the ' ' button. Enter code 00 12 using the
'' and ' ' buttons and confirm it with the ' ' button.
31


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Gas 3002 ECO at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Gas 3002 ECO in the language / languages: English as an attachment in your email.

The manual is 1,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Remeha Gas 3002 ECO

Remeha Gas 3002 ECO User Manual - German - 28 pages

Remeha Gas 3002 ECO Manual - Dutch - 2 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info