610981
5
Zoom out
Zoom in
Previous page
1/8
Next page
05
HI-LINE LV Fan Convector
8.0 Electrical Connection
6.07.08.09.0
WARNING: The electrical installation must comply with local or national wiring regulations.
/////////////////
//
///
//
//
//
//
//
//
//
/// // // //
/
/
/////
//////
/////////
//////////
9.0 Commissioning Procedure
l Fill and vent the system.
l Open both valves fully and check for leaks at pipe
connections.
l Refit the outer case and secure using the 2 fixing screws.
l Switch on electrical supply.
l Check the operation of the unit by following the operating
instructions.
l When installation and commissioning are complete, hand over
instruction manual to end-user.
Fig. 4 Wiring diagram
Colour Code
bl = Blue
br = Brown
r = Red
y = Yellow
l This unit is supplied with a 2m long mains cord.
l A fused electrical spur with a maximum 3A fuse and a switch
having 3mm separation on all poles must be provided in
an easily accessible position. The fused spur must not be
positioned in a bathroom or other similar high humidity
installations.
l For bathroom installations this unit must be connected to an
equipotential bond using the pipe clamp provided in the
accessories pack. Attach clamp to 15mm flow or return
pipework inside the unit and attach earth conductor.
Room Thermostat - if a remote room thermostat is required
to control the fan convector, remove the link between T1 and
T2 on the terminal block and connect a suitable bimetallic
thermostat, capable of operating at low voltages, across these
two terminals. The thermostat cable entry is through the hole in
the chassis. A cable gland must be used.
5.0
Transformer
xxxxxx HiLine LV manual_Layout 1 27/06/2011 09:39 Page 6
5


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Myson HI-LINE LV Fan Convector 7-4 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Myson HI-LINE LV Fan Convector 7-4 in the language / languages: English as an attachment in your email.

The manual is 0,08 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info