741094
11
Zoom out
Zoom in
Previous page
1/164
Next page
11
EN
3.5. Grinding group assembly / disassembly
The assembly / disassembly operations of any
machine part are performed with the stop ma-
chine and with the plug disconnected from the
socket, or with the sectioning device in OFF.
The grinding group Enterprise assembly on the
machine takes place in two phases (in exemplifying
way it is showed the mincer with basic machine.
The phase n. 1 for the grinding group Enterprise is
performed on a working ground following the under
reported order:
Insert in the pipe union (1) in the order: Archimedean
screw (2), cutting knife oriented as in figure and
inserted in the dragging pivot (3), drilled plate (4)
inserted in the pipe union place (1);
Screw down and tighten the blockage wheel (5).
The phase 2 is performed on the machine:
Insert up to the blow the complete grinding group (B)
on the machine (A);
Tighten the mouth stop knob (C) up to when the
grinding group (B) is blocked on the machine (A);
Insert the hopper (D) in the machine neck
In these conditions the machine is ready to work.
The disassembly activities of the grinding group
from the machine are performed following in the
backwards way the assembly phases previously
described, starting from the phase n. 2 passing to
the phase n. 1.
For a plate and knife better improvement and du-
ration it is advised to keep them always coupled.
3.6. Grinding group rotation
The operations here follow indicated must be
performed from the machine maintenance man
(skilled personnel in the electric maintenance
field of the industrial machines).
For machines fed with three phase voltage (3
PE AC 400V 50Hz), slacken lightly the blockage
wheel so as don’t make a strong pressure on the
drilled plate as for the cutting knife. During the
switching on verify that the Archimedean screw /
grater roll rotates in anticlockwise sense.
If there is an clockwise rotation, switch off the
machine disconnecting the plug, disassembly it,
disconnect two phase conductors and invert them
of position.
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Hendi 282007 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Hendi 282007 in the language / languages: English, German, Dutch, French, Italian, Polish as an attachment in your email.

The manual is 5,67 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info