776259
10
Zoom out
Zoom in
Previous page
1/62
Next page
10 GMC-I Messtechnik GmbH
LED and LCD test menu
Menu
Brightness/contrast menu
Software revision level
Calibration date
Display: date / time
Display: automatic shutdown
Display: automatic shutdown
of display illumination after 15 s.
of the tester after 60 s.
Time, language, profiles
1
2
3
4
Battery test
0b
0a
0
Return to main menu
OFFSET submenu
Brightness/contrast submenu
Set time
Profiles for
Default settings
distributor structures
Language for
language
33a
3b
3c
3d
3e
Set date
Duty cycle for
display illumination / tester
Set Time
Menu Selection for Operating Parameters
OFFSET, Brightness and Contrast Settings Set Time, Language, Profiles, Acoustic Signal
Set Date
Set time
Increase
Increase
hours
Accept
settings
minutes
3a
Increase
seconds
Return to submenu
Decrease
Decrease
hours
minutes
Decrease
seconds
Set date
Increase
Increase
Day
Accept
settings
Month
3b
Increase
Year
Return to submenu
Decrease
Decrease
Day
Month
Decrease
Year
Enter and select a new inspector
(change/deletion via ETC only)
3h
3f
5
Current inspector
DB MODE submenu
3g
10


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt Profitest Intro at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt Profitest Intro in the language / languages: English as an attachment in your email.

The manual is 1.69 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info