12 GMC-I Messtechnik GmbH
If no texts or ID numbers have been entered to the test instrument
when creating structures, ETC generates the missing entries
automatically. These can then be edited in ETC and transferred
back to the test instrument if required.
OFFSET RL-PE / RN-PE / RL-N
For the measurement of
ZL-PE, ZL-N, RE and
ΔU(ZLN), ohmic offset val-
ues RL-PE, RN-PE and RL-N
can be ascertained here,
which then appear in the
footers of the corre-
sponding measuring
menu pages and are sub-
tracted from the mea-
sured values.
Connect the mea-
surement cables to
the respective inputs
and short circuit the
test probes by insert-
ing the test plug into the short-circuiting jumper (PRO-
JUMPER, Z503J).
Start offset measurement by pressing the respective START
key.
The respective offset value cannot be activated or deactivated,
i.e. set to 0, unless all settings are returned to their default values.
There’s a separate offset value for RLO, which can be ascertained
directly in the RLO switch position.
Note
MEASUREMENT OF RL-PE OR RN-P
In the event that phase voltage might be applied to L or N
at the test probe or the measuring adapter during future
measurements, both offset values must be correspon-
dingly determined. Depending on the connection, the
corresponding offset value is then displayed later in the
measuring menu. If no phase voltage is applied, RL-PE
appears as a standard display
Note
In order to ascertain the RLN-OFFSET value for measurement
of ΔU(ZLN):
Connect the test probe to the point of common coupling
(measuring device / meter).
Firmware Revision and Calibration Information (example)
Press any key in order to return to the main menu.
Firmware Update with the MASTER Updater
The layout of the test instruments makes it possible to adapt
device software to the latest standards and regulations. Beyond
this, suggestions from customers result in continuous improve-
ment of test instrument software, as well as new functions.
In order to assure that you can take advantage of all of these ben-
efits without delay, the MASTER Updater allows you to quickly
and completely update your test instrument software on-site.
The user interface can be set to either English, German or Italian.
Note
As a registered user, you’re entitled to download the
MASTER Updater and the current firmware version free of
charge from the myGMC page.
Enter and Select a New Inspector
See also section 5.7 on page 15 regarding the entry of a text.
5 General Notes
5.1 Connecting the Instrument
For systems with earthing contact sockets, connect the instru-
ment to the mains with the KS-PROFITEST INTRO test probes
(Z503L) or with the PRO-Schuko measuring adapter (Z503K).
Voltage between phase conductor L and the PE protective con-
ductor may not exceed 253 V!
Poling at the socket need not be taken into consideration. The
instrument detects the positions of phase conductor L and neu-
tral conductor N and automatically reverses polarity if necessary.
This does not apply to the following measurements:
Voltage measurement in switch position U
Insulation resistance measurement
Low-resistance measurement
If measurement is to be performed at three-phase outlets, in dis-
tribution cabinets or at permanent connections, use the cable set
with KS-PROFITEST INTRO test probes (Z503L) (2-pole), and for
phase sequence testing (3-pole). Connection is established with
the test probes: one at PE or N and the other at L.
5.2 Automatic Settings, Monitoring and Shut-Off
The test instrument automatically selects all operating conditions
which it’s capable of determining itself. It tests line voltage and
frequency. If these lie within their valid nominal ranges, they
appear at the display panel. If they are not within nominal ranges,
prevailing voltage (U) and frequency (f) are displayed instead of UN
and fN.
3h
4
01.17.00
5
12


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt Profitest Intro at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt Profitest Intro in the language / languages: English as an attachment in your email.

The manual is 1.69 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info