652332
13
Zoom out
Zoom in
Previous page
1/36
Next page
13
Installation info
fig.8
2.2.1 - PACKING
EVE 05 is delivered completely assembled and
packed in a strong cardboard box. Once the
boiler has been unpacked check that it is in-
tact.
750
430
330
Keep the packaging material
(cardboard box, plastic strips,
plastic bag, etc.) out of the
reach of children as it represen-
ts a choking and suffocation
hazard.
In addition to the boiler packaging contains:
- a bag with:
- installation, use and maintenance
handbook,
- template for fixing the boiler to the wall,
A bag containing:
- 2 dowels with screws hook to fix the boiler
to the wall,
- Only for models TFS, a diaphragm for flue
gas outlet
UNICAL refuses all liability
for injury to persons and ani-
mals or damage to property
resulting from non-observan-
ce of the above.
2
DIRECTIONS FOR
INSTALLER
2.1 - DIRECTIONS FOR
INSTALLER
EVE 05 is a gas boiler which must be instal-
led in accordance with the latest regulations
or rules in force. For the boiler category,
which changes according to the destination
country, see page 6.
NOTE:
Observe the corresponding technical rules and
the building supervisory and statutory
regulations of the country of final use when
installing and operating the system.
Always ensure that an appropriately specialised
company is entrusted with installation, gas
supply and flue gas connection, commissioning
and power supply connection, as well as all
servicing and repair work.
Work on gas conduits and fittings must only
be carried out by a registered service provider.
The system must be cleaned and serviced once
a year. This includes an inspection of the entire
system to see if it is in full working order.
Defects and faults must be eliminated
immediately.
Please note that we can accept no liability
whatsoever for loss or injury resulting from
unauthorised adjustment or manipulation of the
system’s control or regulating devices.
2.2 - INSTALLATION
Only for the TFS (room sealed fan assisted)
models a bag containing:
- 2 sealed room closing covers + 2 sealing
gaskets and the fixing screws. “
13


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Unical EVE 05 RTFS 24 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Unical EVE 05 RTFS 24 in the language / languages: English as an attachment in your email.

The manual is 1,36 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info