Installation
10
Wear safety goggles when drilling!
Use screws that are suitable for the door material.
• Insert 5 hexagon-head screws (6) and tighten securely.
• Release switch-trigger (4) and push right up to trolley (7).
• Tighten switch-trigger buffer screw (4) securely.
Trim (e.g. saw off and debur) projecting part of ceiling bracket (4).
• Release rear switch-trigger buffer (1) and push right back to stop (2).
Open door (3) by hand.
• Push switch-trigger (1) right up to trolley (5). Securely tighten screw
on switch-trigger (1).
Caution!
After installation, check the drive rail for dirt (e.g. drilling
residue) and clean it, if necessary. Apply a little oil with conduc-
tive properties. See maintenance and care instructions.
Mounting the control unit
Connect to mains voltage according to EN 12453 (all-pole
separating fixture)
• Work on the control unit may only be executed if it is de-energised.
• Dry any moisture that has penetrated with a blower.
• Only qualified electricians may connect the control unit to the mains
supply.
• Always install the control unit housing vertically, with the cable channels
downward, without deformation of the housing, so that water cannot
penetrate and so that the lid forms a watertight seal.
• Only attach the housing using the intended fixing points, do not drill
through the rear wall of the housing. The housing will leak.
Connect the signal light control unit to the operator
Attention!
Always lay the cable separately from the house installation.
Otherwise it is possible that the house installation can influence
the function of the signal light control unit.
Permissible cable cross-sections for all terminals:
0.5 mm
2
... 1.5 mm
2
.
17
Signal light control unit Control unit Operator Cable colour
Terminal Terminal
SIG 0 -> 17 green
SIG 1 -> 19 yellow
SIG 2 -> 24 white
-> 23 brown
Connecting the signal light control unit to the mains
supply
Permissible cable cross-sections for all terminals:
1 mm
2
... 2.5 mm
2
.
Description from left to right
Signal light control unit Mains supply: Input
Terminal
L -> AC 220 ... 240 V
N -> Neutral conductor
PE -> Protective earth
Signal light control unit Mains supply: Voltage tap mains power
Terminal
PE -> Protective earth
N -> Neutral conductor
L -> AC 220 ... 240 V