680647
9
Zoom out
Zoom in
Previous page
1/33
Next page
8
Unscrew two steel angle irons with length adjustment holes (1) and
screw them onto ceiling bracket (2) as shown.
Dismantle connecting rod (1):
Pull out retainer and remove bolt (3).
Installing the operator
If the distance between the ceiling and the lower edge of the
C-rail is greater than 245 mm, then extend the suspension
bracket (with perforated steel strip).
Determine door’s highest up-position (DHP):
Open door and measure smallest clearance (min. 35 mm) between
top edge of door and ceiling. The clearance between the highest
up-position and the bottom edge of the C-rails must be a min. of
5 mm and it may be a max. of 65 mm; the push arm must be at a
max. angle of 30°(for up-and-over doors) (see Fig. 17)!
Please note that this distance might be smaller, if the door
handle is located at the centre of the door. Ensure that the door
can move freely.
7
THPTHP
7
5 - 56mm
min. 35mm
THP
THP
7
5 - 56mm
min. 35mm
6
5
65
2
1
1
Operator pre-installation
Remove the operator from its packaging.
Dispose of the packaging correctly in accordance with local
requirements.
When mounting C-rails, ensure that the uncoated inside is
located opposite the chain.
Slot two C-rails (1) into the connecting element (2) and push together
as far as they will go.
Hook tensioner (1) in chain (2) and turn it 90°. Insert connecting
element (6) and push tensioner (1) through it. Place plain washer (5)
and spring (4) onto the tensioning bolt (3) and screw it into the
tensioner (1).
Tighten chain until the mark (arrow) is reached.
Mount bracket (2) with screw (1) and nut (3) on the connecting
element (4).
4
3 4
17mm 17mm
10mm
V
1
2
3
V
1
1
1
2
1
2
3
2
a
c
90°
b
1
2
3
4
5
6
V
V
Installation
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Sommer Marathon Tiga 1100 SL at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Sommer Marathon Tiga 1100 SL in the language / languages: English as an attachment in your email.

The manual is 2,36 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Sommer Marathon Tiga 1100 SL

Sommer Marathon Tiga 1100 SL User Manual - German - 33 pages

Sommer Marathon Tiga 1100 SL User Manual - Dutch - 33 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info