11 Commissioning
NOTICE!
Commissioning should only be performed by
specially trained personnel and documented
after the certificate has been issued.
NOTICE!
Observe the manuals for the unit and all other
components when commissioning the entire
system.
Function test for cooling operating mode
1. Switch the power supply on.
2. Open all shut-of
f valves if necessary.
3. Switch on the chiller and the corresponding
circulation pump. The outlet temperature
must be between +4 and +18 °C.
4. Switch the unit on and select the cooling
operating mode. If the return temperature is
warmer than the setting, the compressor dis-
play will flash and the compressor will begin
to work after approx. 3 to 5 minutes.
5. Please note that the inlet temperature at the
nominal flow rate of the medium lies approx.
5 K below the return temperature.
- If the inlet temperature falls below the fac-
tory setting of 4 °C, an alarm triggers. If this
is the case, a higher return temperature must
be selected. If the spread is too great or too
small, the medium flow rate must be
checked.
- The circulation pump starts and the con-
troller checks the medium flow rate via the
dif
ferential pressure switch. If the volume is
insufficient, a fault shut-off will be carried out
and the cooling cycle will not be enabled.
6. Measure and record all the required values in
the commissioning report and check the
safety functions.
7. Check the unit control system using the func-
tions described in the "Operation" chapter
.
Final tasks
n Mount all removed parts.
n Familiarise the operator with the system.
The delivery of the unit from the factory takes
place with standard parameterisation of the
output control. If necessary during commis-
sioning a system-specific parameterisation
must be carried out by authorised personnel.
51
51


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO KWE serie 150-180-220-250-300-320-370-440 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO KWE serie 150-180-220-250-300-320-370-440 in the language / languages: English as an attachment in your email.

The manual is 2,8 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO KWE serie 150-180-220-250-300-320-370-440

REMKO KWE serie 150-180-220-250-300-320-370-440 User Manual - German - 60 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info