587583
21
Zoom out
Zoom in
Previous page
1/32
Next page
10
Incline of the condensate line
minimum
2% incline
The condensate hose is designed
to be connected on the left-hand
side (as viewed from the front).
All electrical installation
work should be performed
by specialist contractors.
Disconnect the power supply
when connecting the electrical
terminals.
! ATTENTION
Leak testing
Pumping down to
vacuum
Once all the connections have
been made, the pressure gauge
station is attached to the Schrader
valve as follows (if fitted):
red = small valve
= injection pressure
blue = large valve
= suction pressure
Following connection of the quick-
release couplings, the connections
are checked using leak detection
spray and suitable devices for leak-
tightness. If leaks are found, the
connections have not been made
properly. Tighten the connection
or, if necessary, remove the quick-
release coupling and check for
contamination or damage.
A vacuum of min. 20 mbar
must be created!
! ATTENTION
The time required to generate the
vacuum is dependent on the
pipe volume of the indoor unit
and the length of the refrigerant
pipes. This always takes at least
60 minutes.
Once any foreign gases and
humidity have been completely
extracted from the system, the
valves on the pressure gauge
station are closed and the valves
on the outdoor component
are opened as described in the
"Commissioning" section.
Electrical connection
A mains cable must be installed
as voltage supply and a control
cable to the indoor unit. The air
conditioning unit should be fused
in accordance with the technical
data. The pre-installed control
cable on the indoor unit must be
laid to the outdoor component.
We recommend installing
a main / repair switch on the
building close to the indoor
unit.
If an optionally available
condensation pump is used
on the unit, then an additional
relay for the shut-off contact
of the pump will be needed
to increase the switching power
to shut off the compressor.
Both units are pre-filled with
refrigerant. Pumping down to
vacuum is not required before
first commissioning.
! ATTENTION
Condensate draining and
ensured discharge
Condensate connection
If the temperature falls below the
dew point, condensation will form
on the finned condenser during
heating operation.
A condensate drip pan should be
installed on the underside of the
unit to drain any condensate.
The condensate drain pipe to
be installed on-site must be in-
stalled with a in cline of at least
2 % for good drainage.
If necessary, fit vapour density
insulation.
When operating the system at
outdoor temperatures below
4 °C, care must be taken that
the condensate line is frost
protected. The lower part of the
housing and condensate pan
are to be kept frost free in order
to ensure permanent drainage
of the condensate.
If necessary, fit supplementary
pipe heating.
After completed installation,
check that the condensate
drainage is unobstructed and
ensure that the line is leak tight.
Ensured discharge in the event of
leakage
Local regulations or environmen-
tal laws, for example the German
Water Resource Law (WHG), can
require suitable precautions to pro-
tect against uncontrolled draining
in case of leakage to provide for
safe disposal of escaping refrigera-
tor oil or hazardous media.
21
21


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO BL351 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO BL351 in the language / languages: English as an attachment in your email.

The manual is 4,4 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO BL351

REMKO BL351 User Manual - German - 28 pages

REMKO BL351 User Manual - German - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info