685364
20
Zoom out
Zoom in
Previous page
1/42
Next page
FINISHING THE INSTALLATION
CHECK LIST
Unit is securely mounted to vehicle
All fasteners are torque to specification
Fuel lines are properly secured
Battery cables are properly secured
Power cable is properly secured
Cables and fuel lines are away from moving components
Cables and fuel lines are away from exhaust
Fuel lines are double clamped and all clamps are tight
All AC power connections are complete and tight
Driver control panel installation is complete
Power outlet box installation is complete
Battery Charger installation is complete
Heating and Air conditioner installation is complete (optional)
FIRST TIME START UP
Before starting the PT-3000:
Check oil level in the Engine
Check coolant level
Make sure all electrical connections are complete
Make sure fuel lines are connected and contain no kinks
Make sure driver control panel Start/Stop switch is in OFF position
Make sure the main power switch in the control panel on the APU is in OFF position
Connect the positive battery cable from the APU to the truck battery
Purge all air from fuel system (See Below)
Check that Air Conditioner / Heater and all AC loads are Turned OFF.
IMPORTANT: Purging Air from Fuel System
Before starting the PT-3000 for the first time it is important to purge the fuel
system of all air trapped in the fuel lines. To do this disconnect the Positive + terminal of
the electric fuel pump from the wiring harness and jumper it to a +12V DC source
(Positive + Battery post on starter). The pump will begin pumping fuel and force any
trapped air out through the return line. Continue pumping fuel through the system for 1
minute. Disconnect the jumper wire and reconnect the Positive + terminal of the fuel
pump to the wiring harness. The PT-3000 is now ready to start.
Turn the main power switch located on the control panel inside the APU to the
ON position. Inside the truck, turn the driver’s control switch to the ON position. The
APU will begin the pre-heat and engine cranking cycle.
WARNING: Be careful of moving parts!!!
17
20


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for PowerTech PT-3000 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of PowerTech PT-3000 in the language / languages: English as an attachment in your email.

The manual is 3,09 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info