2.2.7 Cooler connection (gg. 4, 29, 30)
Take the cover off the boiler (ref. 4 g. 3) after removing the nut cover and the xing nut.
IMPORTANT: Do not make the connections using normal hydraulic pipes that could contain residues of ashing, dirt or
water and that could damage the parts inside the unit and interfere with proper operation.
Use only special copper pipes for cooling, that are supplied clean and sealed at the ends.
After cutting the proper lengths, seal the ends immediately on the roll and cut piece.
Pipes for refrigeration with preinsulation can also be used.
Only use pipes with the a diameter suitable for the dimensions described in the technical data sheets.
- Plan the route of the pipeline so as to reduce the length and number of bends as much as possible for best performance of
the system. The maximum length of the lines connecting the outside unit to the inside unit is 10 m in both directions.
- maximum height different between two units +/- 5 m.
- Fasten a cable raceway to the wall (possibly with internal partitioning) of suitable size for the pipes and electric wires to pass
through.
- Cut the sections of pipe leaving an extra 3-4 cm on the ends.
IMPORTANT: use a wheel pipe cutter only to cut the pipes (g. 28) clamping it in short lengths so as not to crush the pipe.
NEVER USE A NORMAL HANDSAW
scraps could fall inside the pipe and enter the circuitry of the system, damaging the parts severely (g. 29 A).
- Remove possible burrs with the special tool.
IMPORTANT: immediately after cutting and deburring the pipes, seal the ends with insulating tape.
If you do not use preinsulated pipes, they must be insulated as follows:
- material: polyurethane foam with closed cells
- max. coefcient of transmission : 0,45 W/ (Kxm
2
) or 0.39 kcal/(hxCxm
2
)
- minimum thickness: 6 mm (for liquid pipes)
- minimum thickness: 9 mm (for gas pipes)
Do not place both pipes in the same sheath, as this would jeopardize the proper operation of the system (g. 29 B).
- Bind any joints in the sheath securely with insulating tape.
- Before aring the pipe ends, insert the fastening nut (g. 30 A).
- Flare the pipe ends using the special tool. Take care not to break, crack or split the pipe (g. 30 B).
- Lubricate the connecting thread with oil for coolant (DO NOT USE ANY OTHER TYPE OF LUBRICANT).
- Screw the pipe nut manually on the connecting thread.
- Tighten using a wrench to hold the threaded part of the connector, so as to avoid twisting the pipe, and a
dynamometric wrench on the nut (g. 31) calibrated with the following values depending on the size of the pipe:
- 14-18 Nxm (1.4-1.8 kgxm) for pipe diameter ø 6-6.4 mm (1/4")
- 33-40 Nxm (3.3-4.0 kgxm) for pipe diameter ø 9.5-10 mm (3/8")
CAUTION:
- This product may only be serviced by a qualied and certied technician.
- Do not allow the uorinated gas inside to escape.
- Make sure the uorinated gas is never released into the atmosphere during installation, servicing or disposal.
- If any leakage of uorinated gas is discovered, the leak must be found and repaired as quickly as possible.
- Any use of uorinated gas in this product must comply with Regulation (EU) 517/2014 and any local rules that apply.
- No additional lling is needed in the installation phase.
- Do not exceed the load stated on the data plate.
45


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Olimpia Splendid Unico Boiler at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Olimpia Splendid Unico Boiler in the language / languages: English, German, French, Italian, Spanish as an attachment in your email.

The manual is 21,81 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info