653301
12
Zoom out
Zoom in
Previous page
1/36
Next page
12
SECTION 4 - gENEral INSTallaTION rEquIrEmENTS
4.1 RECOMMENDATIONS
Current Gas Safety (Installation and Use) Regulation or Rules in
Force.
Theboilerissuitableonlyforinstallationinthespeciedcountries
and should be installed in accordance with the rules in force.
In GB, the installation must be carried out by a Gas Safe
RegisteredEngineer,orinothercountriesaqualiedand
competent Gas Installer. It must be carried out in accordance with
the relevant requirement of the:
• GasSafety(InstallationandUse)Regulations
• AppropriateNationalStandards
• TheWaterFittingsRegulations
• CurrentIEEWiringRegulations
• Health&SafetyDocumentNol.635
• TheElectricityatworkRegulations1989.
• BS5482Part1CodeofPracticeforDomesticbutaneand
propane gas burning installation in permanent dwellings,
residential park homes and commercial premises.
• BSEN1949:2011SpecicationfortheinstallationofLPG
Systems for habitation purposes in leisure accommodation
vehicles and other road vehicles.
IMPORTANT
The manufacturer’s notes MUST NOT be taken, in any way as
overriding statutory obligations.
4.2 BOILER LOCATION
Theboilermustbeinstalledonaatandverticalwall,capableof
adequately supporting the weight of the boiler and any ancillary
equipment.
Theboilermaybettedonacombustiblewallandinsulation
between the wall and the boiler is not necessary unless required
by National Standards.
For Electrical Safety reasons there must be no access available
from the rear of the boiler.
Theboilermustnotbettedoutside.
BATHROOM INSTALLATIONS
This appliance is rated IP20.
The boiler may be installed in any room or internal space, although
particular attention is drawn to the requirements of the current
IEE (BS.7671) Wiring Regulations and the electrical provisions
of the building regulations applicable in Scotland, with respect to
the installation of the boiler in a room or internal space containing
a bath or shower. For IE reference should be made to the current
ETCI rules for electrical installations and I.S. 813:2002.
If the appliance is to be installed in a room containing a bath or
shower then, providing water jets are not going to be used for
cleaning purposes (as in communal baths/showers), the appliance
must be installed beyond Zone 2, as detailed in BS.7671.
0.6m
Zone 0
Recessed
window
Zone 2
Ceiling
3G8913a
2.25m
Zone 1
COMPARTMENT INSTALLATIONS
A compartment used to enclose the boiler should be designed
and constructed specially for this purpose.
An existing cupboard or compartment may be used, provided
thatitismodiedforthepurpose.
• ThepositionselectedforinstallationMUSTallowadequate
space for servicing in front of the boiler.
4.3 FLUE TERMINAL POSITION
Pluming will occur at the terminal so avoid locations where this
will cause a nuisance.
The boiler MUST be installed so that the terminal is exposed to
external air.
It is important that the positions of the terminal allows the free
passage of air accross it at all times.
Minimum acceptable spacing from the terminal to obstructions
andventilationpumparespeciedinthetablebelow.
ForCaravanHolidayHomes;iftheheightoftheueterminal
from any ground, decking or steps is under 1.5m then a suitable
terminalguardshouldbetted.
For Residential Park Homes, please refer to BS 5440 Part 1.
Terminal Guards are available from boiler suppliers.
TFC Flue Guard - Model K6 Round Plastic Coated.
www.tfc-group.co.uk
* Only one reduction down to 25mm is allowable per installation
otherwise BS5440-1 2008 dimensions must be followed.
Flue Terminal Positions
Min. Spacing*
1. Directly below, above or alongside an opening
window, air vent or other ventilation opening. 300mm (12”)
2. Below guttering, drain pipes or soil pipes. 25mm ( 1”)*
BS5440-1 2008 75mm (3”)
3. Below eaves. 25mm (1”)*
BS5440-1 2008 200mm (8”)
4. Below balconies or a car port roof. 25mm (1”)*
BS5440-1 2008 200mm (8”)
5. From vertical drain pipes or soil pipes. 25mm (1”)*
BS5440-1 2008 150mm (6”)
6. From an internal or external corner or to a 25mm (1”)*
boundary along side the terminal. BS5440-1 2008 300mm (12”)
7. Above adjacent ground, roof or balcony level. 300mm (12”)
8. From a surface or a boundary facing the terminal. 600mm (24”)
9. From a terminal facing a terminal. 1,200mm (48”)
10. From an opening in a car port
(e.g. door or window) into dwelling. 1,200mm (48”)
11. Vertically from a terminal on the same wall. 1,500mm (60”)
12. Horizontally from a terminal on the wall. 300mm (12”)
Vertical Terminals
13. Above the roof pitch with roof slope of all angles. 300mm (12”)
Aboveatroof. 300mm(12”)
14. From a single wall face. 300mm (12”)
From corner walls. 300mm (12”)
15. Below velux window 2000mm (79”)
16. Above or side of velux window 600mm (24”)
Table 4 - Balanced Flue Terminal Position
12


Need help? Post your question in this forum.

Forumrules
1

Forum

morco-gb24-series-ii

Reset search

  • We have this Boiler fitted in our Caravan and not had a trouble till we had the boiler serviced since then the boiler will deal with the hot water but if you put it onto timer for the central heating the boiler comes in and when it gets to temperature goes out but then when the temperature drops the boiler does not come back in and shows L-2 which means it’s locked out please advice what can be the trouble thankyou Submitted on 10-11-2021 at 19:52

    Reply Report abuse
  • Je voudrais savoir pourquoi s affiche sur l écran de contrôle F 9 qui clignote. Et pas d eau chaude. Submitted on 29-6-2021 at 18:11

    Reply Report abuse
  • Hot water working but no heating and no fault codes Submitted on 12-4-2021 at 18:39

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Morco GB24 Series II at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Morco GB24 Series II in the language / languages: English as an attachment in your email.

The manual is 6,25 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info