Before commissioning the appliance, the whole gas
installation including the meter (if fitted) MUST be
purged and tested for gas soundness.
IMPORTANT: open all doors and windows, extin-
guish naked lights, and DO NOT SMOKE whilst
purging the gas line.
Before commencing the commissioning procedure,
ensure that the central heating system and the
domestic hot and cold water system have been
flushed. This will remove contamination which could
block the filters fitted to the cold inlet and C.H. return
connections resulting in incorrect functioning of the
boiler.
6.1 DOMESTIC HOT WATER
Turn on the Mains cold water isolation valve..
Fill and vent the installation by turning on the various
hot water taps in the installation
Make sure that there are no leaks in the installation.
6.2 CENTRAL HEATING CIRCUIT
In order for the boiler to function correctly, the pres-
sure in the central heating circuit must be between
0.8 and 1.6 bar when cold.
Both the boiler and the central heating installation
must be purged of any air in the water pipes which
may cause noise/malfunctions/damage to the boiler.
The boiler is fitted with an automatic air vent always
ensure that the vent cap is loose prior to
comissioning.
In order to fill the installation correctly the following
sequence must be followed:
- Open one or more radiator bleed vent screws.
- Fill the central heating circuit using the approved
method given in section 4.8
- Turn off each of the air vents as water starts to
appear from them.
- Turn off the filling tap when the pressure gauge
exceeds 1.6 bar.
- Turn the main control switch to the winter setting,
making sure that the pump runs. The pump will not
run if there is insufficient pressure.
- Vent the central heating circuit once more. Then let
the pressure in the circuit settle at 1.6 bar. If
necessary open the pump drain to reduce the pres-
sure in the system.
- Make sure that there are no leaks in the installation.
6.3 GAS CIRCUIT
Purge the gas circuit as described above. Turn on
the gas cock to the installation and check that there
are no leaks using leak detection fluid.
6.4 SETTINGS
Before leaving the factory the boiler is pre-set in
accordance with the information on the data plate,
and therefore needs no further adjustment.
6.5 INITIAL OPERATION
6.5.1 Preliminary warnings
- Make sure that the central heating circuit is
completely full and vented. The pressure gauge
should indicate a pressure of between 0.8 and 1.6
bar.
- Make sure that the air intake and the flue outlet are
not blocked.
6.5.2 Domestic hot water service
To turn on the boiler turn the main control switch, the
green light shows, or ‘ON’ can be seen in the display.
The boiler is then ready to supply D.H.W. on demand.
Whenever a hot tap is opened the boiler automatical-
ly fires up to deliver hot water. The temperature
selector control should be set at maximum. If the
ambient water temperature is high (as in a hot cli-
mate) then the hot water temperature may be
reduced by using this knob.
6.5.3 Hot water and central heating service
Set the tappets on the time clock to an on position
and the main control switch on so the green light is
on. The room stat (if fitted) to max temp. Then turn
the central heating selector clockwise. The boiler will
fire up. By means of the central heating temperature
selector control knob, any water temperature of
between 60 and 85°C, may be seleced. The boiler
will remain on until the temperature selected on the
room thermostat or on the boiler itself is reached.
NOTE: If the boiler has configured for under floor
heating then only the temperature entered in the
installer menu will be available. turning the control
knob will have no effect.
Whenever there is a demand for D.H.W. on the cen-
tral heating setting, the boiler is ready to supply it giv-
ing priority to the D.H.W. with the central heating on
standby until the D.H.W. demand ceases.
6.5.4 Turning the boiler off
- Turn the main control switch to the setting.
- Turn off the gas supply to the boiler.
6.- COMMISSIONING INSTRUCTIONS
17


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Morco FEB-24ED at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Morco FEB-24ED in the language / languages: English as an attachment in your email.

The manual is 3,48 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info