To ensure continued efficient operation of the appli-
ance, it is recommended that it is checked and serv-
iced as necessary at regular intervals. The frequen-
cy of servicing will depend upon the particular instal-
lation conditions and usage but in general once a
year should be adequate.
It is the law that any service work must be carried out
by competent gas registered engineer.
Before commencing any service operation, ISOLATE
the mains electric supply, and TURN OFF the gas
supply at the main service cock. Service the appli-
ance by following the full procedure detailed below.
MINIMUM CLEARANCE REQUIRED FOR SERVIC-
ING AND REPLACEMENT OF PARTS
* Distance at the side
The minimum distance necessary for carrying out
maintenance operations, is 5 mm
* Distance at the top
The minimum distance necessary for carrying out
maintenance operations, is 200mm
* Distance at the bottom
The minimum distance necessary for carrying out
maintenance operations, is 250 mm.
* Distance at the front
The minimum distance necessary for access during
maintenance operations, is 250mm, although this
distance may be reduced to 5 mm, as long as a door
is installed which can be removed when it comes to
carrying out maintenance work.
FRONT COVER REMOVAL
The cover is held in place by four spring clips and can
be removed by grasping it at the top and pulling for-
ward sharply to release.
Further access can be gained by removing the con-
trol panel. (Four screws), and moving down the elec-
tronic box.
6.5.5 Appliance safety lock-out
If the boiler develops a fault the red LED will illumi-
nate and the digital display shows the relevant fault
code; see p19.
To restart the boiler Set the main control on the
position and then turn it back to the chosen position.
The red LED should go out.
IMPORTANT: Whenever the boiler has been left idle
for any length of time, or when a new gas bottle is
installed (propane models), the appliance may switch
off due to the presence of air in the pipes. In cases
such as these, the main control switch may be turned
to position several times until all the air is
expelled.
6.6 FINAL CHECKS
- Re-light and test for gas soundness
- Set the C.H. and D.H.W. temperature selectors to
the required settings.
- Ensure that the time clock and/or room stat (if fit-
ted) are set to the required setting (s).
6.7 USER’S INSTRUCTIONS
Upon completion of testing the system, the installer
should:
- Give the 'users Instructions' to the owner and
emphasise their responsibilities under the "Gas
Safety (Installation and Use) Regulations 1998"
- Explain and demonstrate the lighting and shut
down procedures.
- Advise the owner on the efficient use of the system,
including the use and adjustment of all system con-
trols for both D.H.W. and C.H.
- Advise the user of the precautions necessary to
prevent damage to the system, and to the building, in
the event of the system remaining inoperative during
frost conditions.
- Explain the function of the boiler lock-out devices,
and how to reset it. Emphasise that if cut - out per-
sists, the boiler should be turned off and the installer
or service engineer consulted.
- Stress the importance of an annual service by a
competent gas registered engineer.
7.- ROUTINE SERVICING INSTRUCTIONS
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Morco FEB-24ED at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Morco FEB-24ED in the language / languages: English as an attachment in your email.

The manual is 3,48 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info