643410
25
Zoom out
Zoom in
Previous page
1/74
Next page
800 max
800 max
23
4-INSTALLATION AND ASSEMBLY
Technical Dept. - All rights reserved - Reproduction is prohibited
PELLET LOADING CHUTE ASSEMBLY
Another decision to be made before positioning the product is to dene the side on which to install the chute for loading fuel. The pel-
lets fuelled Vivo 80 Hydro is delivered with two clamps, the connection pipe and chute with hatch.
The chute can be tted on the right side, on the left side or frontally. The connection pipe is 1 metre long.
It is mandatory to shorten the connection pipe, depending on its positioning (side or front), so that it is well taut and
forms a minimum angle with respect to the horizontal as shown in the drawing. This operation is necessary for the pellets'
descent.
Before setting up the cladding carry out a fuel loading test to assess its proper descent towards the hopper.
It is mandatory to insulate the pipe properly in the event this is tted on the left side in correspondence of the smoke evacu-
ation duct. Fire hazard!
Chute assembly
In the event one decides to position the pipe laterally, the distance from the machine axis to the wall must be at least 80 cm (gure
shown here).
To position the chute act as follows:
Connect the supplied pipe to the product paying attention that it is rotated sideways, and fasten it with the clamp.
Connect the pipe (in the upper part) to the opening of the door structure with the supplied clamp.
Position the pipe with the door structure so that, when the cladding is complete, one can screw and fasten it to the cladding wall in
correspondence of the hole made for its insertion.
To assemble the external door, which must only be done when the cladding is complete, refer to the relative section.
25


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ Vivo 80 Pellet Hydro at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ Vivo 80 Pellet Hydro in the language / languages: English as an attachment in your email.

The manual is 12,73 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ Vivo 80 Pellet Hydro

MCZ Vivo 80 Pellet Hydro Usermanual and installation guide - Dutch - 64 pages

MCZ Vivo 80 Pellet Hydro Usermanual and installation guide - French - 64 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info