English Page 14
D. Installation
While lowering the boom and by extending the linking bar the door opening
is enlarged. The linking bar may only be extended so far that the inner pressure
rolls (H) do not touch the fixing screws (I).
Suspension of the operator system
Suspension of motor unit
• Fix 1 support plate (A) above the motor unit (see as well point 3).
• Bend the plate according to site requirements.
Suspension of boom
• Push 1 support plate (A) through suspension clamp (B) and bend projecting
parts.
• Positioning of the suspension of boom (see as well point 3).
11
GB
English Page 79
I. Connection and initial operation of the extension units
Lighting (relay for special functions)
Function: When the operator is started, the relay shortly connects (wipe
impulse)
Connection of relay circuit board (Art.No. 153 044)
36
Attention!
Please always plug on the flat cable plug in such a way, that the
cable is bent in direction of the edge of circuit board!
• Connect relay circuit board and control unit by means of the enclosed flat
cable.
Relay circuit board: Plug connection X4
Control unit: Plug connection X8d
Detailed wiring diagram lighting (relay for special functions):
Legend:
K Automatic light (on site)
K1 Relay OPERATOR RUNS (WIPE IMPULSE)
K2 Relay OPERATOR RUNS (WIPE IMPULSE)
Plug connections:
X4 Relay control
X8d Relay for special functions
(in control unit)