771408
30
Zoom out
Zoom in
Previous page
1/36
Next page
Manifold Gauge
Pressure gaugeCompound gauge
High pressure
valve
-76cmHg
Charge hose
Low pressure valve
Vacuum
pump
Low pressure valve
Pressure hose/
Charge hose
Flare nut
Cap
Valve stem
Valve body
Page 30
10. Air Evacuation
Preparations and Precautions
Air and foreign matter in the refrigerant circuit can cause
abnormal rises in pressure, which can damage the air
conditioner, reduce its efciency, and cause injury. Use
a vacuum pump and manifold gauge to evacuate the
refrigerant circuit, removing any non-condensable gas
and moisture from the system
Evacuation should be performed upon initial installation
and when unit is relocated.
BEFORE PERFORMING EVACUATION
5Check to make sure the connective pipes between
the indoor and outdoor units are connected properly.
5Check to make sure all wiring is connected properly.
Evacuation Instructions
1. Connect the charge hose of the manifold gauge to
service port on the outdoor unit's low pressure valve.
2. Connect another charge hose from the manifold
gauge to the vacuum pump.
3. Open the Low Pressure side of the manifold gauge.
Keep the High Pressure side closed.
4. Turn on the vacuum pump to evacuate the system.
5. Run the vacuum for at least 15 minutes, or until
the Compound Meter reads -76cmHG (-105Pa) del
sistema.
6. Close the Low Pressure side of the manifold gauge,
and turn off the vacuum pump.
7. Wait for 5 minutes, then check that there has been no
change in system pressure.
8. If there is a change in system pressure, refer to Gas
Leak Check section for information on how to check
for leaks. If there is no change in system pressure.
unscrew the cap from the packed valve (high pressure
valve).
9. Insert hexagonal wrench into the packed valve (high
pressure valve) and open the valve by turning the
wrench in a 1/4 counterclockwise turn. Listen for
gas to exit the system, then close the valve after 5
seconds.
10. Watch the Pressure Gauge for one minute to make
sure that there is no change in pressure. The Pressure
Gauge should read slightly higher than atmospheric
pressure.
11. Remove the charge hose from the service port.Utilice
una llave hexagonal para abrir al máximo la válvula
de alta presión y la válvula de baja presión.
12. Using hexagonal wrench, fully open both the high
pressure and low pressure valves.
13. Tighten valve caps on all three valves (service port,
high pressure, low pressure) by hand. You may
tighten it further using a torque wrench if needed..
OPEN VALVE STEMS GENTLY
When opening valve stems, turn the hexagonal wrench
until it hits against the stopper. Do not try to force the
valve to open further.
30


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Kaysun AKAY-CF 52 DR10 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Kaysun AKAY-CF 52 DR10 in the language / languages: English as an attachment in your email.

The manual is 3.88 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Kaysun AKAY-CF 52 DR10

Kaysun AKAY-CF 52 DR10 User Manual - German - 36 pages

Kaysun AKAY-CF 52 DR10 User Manual - Dutch - 36 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info