590771
132
Zoom out
Zoom in
Previous page
1/160
Next page
132 GMC-I Messtechnik GmbH
Appendix
10 Appendix
10.1 Test Sequences
The following flowchart is representative of all test sequences.
The control test sequence is started automatically in the back-
ground, during the course of which all preliminary tests are exe-
cuted which are required for a safe test sequence.
The number and type of test steps varies in the visible part of the test
sequence depending upon which standard has been selected.
How the various test steps included in the test sequences can be
accessed and modified is described in section 7.4.3 (factory de-
fault setting: read only). The test sequences are described in de-
tail in section 7.4.3.
Flow Chart
Probe
2)
connected?
Short-circuit
at DUT?
Yes
Control test sequence in background (safety tests are being executed, schedule checking)
Yes
U < 15 V
1)
Check whenever the test system is connected to mains power.
2)
Check if test steps are included in the sequence for which the probe is required.
U > 15 V
R > 15 k
PE
1)
connected?
R < 15 k
Note:
Touch contact surface (test for hazardous shock voltage)
PE
potential
1)
?
No
R > 3
R < 1.5
No
Start of visible part of the test sequences
U
Mains
?
Testing of operating voltage (if mains connection is required for the test sequence)
U < 200 V
U = 230 V
Switch-on Check
„Please switch on DUT“
can be skipped with NO for DUTs with electronic switch
Abort testing
Abort testing
Abort testing
Abort testing
Abort testing
132


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt SECUSTAR FM at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt SECUSTAR FM in the language / languages: English as an attachment in your email.

The manual is 1,75 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info