813400
25
Zoom out
Zoom in
Previous page
1/28
Next page
25
Servicing Instructions - Replacing Parts
10. Gazco Flue Sure System
If the appliance has been installed in a restrictive location, it
may be necessary to remove the appliance from its location.
10.1 Locate the sensor in the draught diverter opening, and
gently pull the two wires off the terminals.
10.2 Undo the 2 screws and remove the sensor and the 2 plastic
spacers, see Diagram 19.
19
10.3 Refit a new sensor ensuring the spacers are located
between the sensor and the bracket. Replace the two leads.
10.4 If it has been necessary to remove the appliance, ensure
that all disturbed gas joints are checked for gas soundness
when reinstalled, and repeat the flue clearance test as
detailed in the Commissioning Section.
11. Primary Aeration Plate
11.1 Turn the gas supply off at the isolation device.
11.2 Locate the aeration plate on the underside of the airbox and
remove the Nyloc nut, see Diagram 20.
20
11.3 Remove the plate and replace with the correct size, ensure
that the hole(s) in the plate align correctly with the holes in
the underside of the airbox and replace the Nyloc nut.
12. Changing Between Gas Types
A kit of parts is available for this - Contact your Gazco
retailer for further information.
Always quote the Model number and Serial number when
ordering any spare parts.
13. Control Upgrade
See Installation Instructions, Section 2.
25


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Steel Manhattan Coal Conventional at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Steel Manhattan Coal Conventional in the language / languages: English as an attachment in your email.

The manual is 2.07 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info