813400
22
Zoom out
Zoom in
Previous page
1/28
Next page
22
2.7 Refit in reverse order.
2.8 Ensure that the rope seal on the back of the glass frame is
intact. Replace the glass frame and tighten the 6 screws
evenly, see Diagram 2. DO NOT OVERTIGHTEN.
2.9 Offer the decorative steel trim to the opening, inserting the 2
tags on the bottom of the trim behind the bottom panel. Lift
the top of the trim up and hook the lugs on the back of the
trim over the top of the glass frame, see Diagram 7.
7
NEVER OPERATE THE APPLIANCE WHEN THE GLASS
FRAME IS REMOVED, OR THE GLASS IS BROKEN.
2.10 Replace ALL of the securing screws ensuring that a screw is
present in all fixing slots.
UNDER NO CIRCUMSTANCES SHOULD THE
APPLIANCE BE USED IF ANY OF THE FRAME
RETAINING SCREWS ARE LOOSE OR MISSING.
3. Main Burner
3.1 Turn the gas supply off at the isolation device. Ensure the
unit is cool.
Use cover material to front of appliance to protect paintwork.
3.2 Remove the door and place to one side, see Section 2,
carefully remove the ceramic fuel bed components.
3.3 Remove the front cover plate by removing the 2 screws.
3.4 Remove the cover plater fixing bracket by removing the 2
wing nuts. (Small appliances only)
3.5 Unscrew pilot union nut on gas valve, see Diagram 8.
8
Servicing Instructions - Replacing Parts
3.6 Disconnect thermocouple from gas valve, see Diagram 9.
Remove ignition lead from electrode.
Cut cable tie to ignition lead if required.
A
9
3.7 Loosen main injector nut on airbox and disconnect from
injector, see Diagram 10, A.
A
10
3.8 Remove the 2 screws attaching burner to back of unit, see
Diagrams 11.
3.9 Carefully withdraw burner unit upwards and tilt to remove
the burner through door opening.
3.10 Remove the 2 screws holding the heat shield in place.
11
3.11 Replace in reverse order checking all joints for leaks.
22


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Steel Manhattan Coal Conventional at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Steel Manhattan Coal Conventional in the language / languages: English as an attachment in your email.

The manual is 2.07 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info