813405
31
Zoom out
Zoom in
Previous page
1/40
Next page
31
SERVICING INSTRUCTIONS
REPLACING PARTS - CONVENTIONAL FLUE
Ignition lead
19
Earth Connection
Stepper Motor
Harness
Interrupter
Lead Set
AR2510
Touch Pad
Supply Cable
Battery Power
Supply Cable
Remote Handset
Pairing Button
10.3 After replacing the control box ensure all cables connections
are refitted as detailed in Diagram 20.
AR2660a
Touch Pad
Supply Cable
Battery Power
Supply
Touch Pad
Control
Ignition Lead
20
Stepper Motor Cable
Pilot Pipe
Thermocouple Earth Lead
Interrupter Leads
10.4 Prior to re-connection of the control box to the appliance, if
there is no communication between the remote handset
and the appliance, or if the handset is replaced, it will be
necessary to pair the (new) handset with the appliance.
10.5 Ensure batteries are fitted and working in the handset.
10.6 Re-fit the touch pad control cable and the battery power
supply cable to the control box.
10.7 Press the On/Off button () for at least 10 seconds. The
LED will flash on and off as normal during this time. When
the LED on the control lights up for at least 1 second
release the button.
10.8 Within 5 seconds of the LED going out press the () button
followed directly by the () button.
10.9 Within 20 seconds press the yellow button on the control
box (see Diagram 19). This may be easier using a pencil,
ball point pen or similar.
10.10 The control box will beep to confirm the pairing operation
has been successful.
If there are any difficulties achieving pairing ensure that
the handset is set to Channel A. To do this follow the
steps below:
10.11 Press the On/Off button () for at least 10 seconds. The
LED will flash on and off as normal during this time. When
the LED on the control lights up for at least 1 second
release the button.
10.12 Within 5 seconds of the LED going out press the OK button
and then press the () button.
10.13 Disconnect the batteries from the control box and
reconnect after 10 seconds. The handset will now be set to
Channel A.
10.14 Attempt the pairing again following the steps below:
NOTE: These steps differ from the previous.
10.15 Press the On/Off button () for at least 10 seconds. The
LED will flash on and off as normal during this time. When
the LED on the control lights up for at least 1 second
release the button.
10.16 Within 5 seconds of the LED going out press the () button
followed directly by the () button.
10.17 Disconnect the battery pack from the control box and
reconnect after 10 seconds.
10.18 The motor on the valve will turn. Once it has stopped
repeatedly press and release the yellow button on the
control box until the control beeps to confirm the pairing
operation has been successful.
11. CHANGING BETWEEN GAS TYPES
In order to change between gas types, it will be necessary to
change the following items:
Burner Unit
Pilot Unit
Control Valve
Injector
Aeration Plate (if required)
Data badge
A kit of parts is available for this, always quote the Model
number and Serial number when ordering any spare parts.
NOTE: THE CONTROL VALVE IS FACTORY PRESET FOR
THE CORRECT GAS TYPE AND MODEL, A NEW UNIT
WILL NEED TO BE ORDERED WHEN CHANGING
BETWEEN GAS TYPES.
31


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Riva F67 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Riva F67 in the language / languages: English as an attachment in your email.

The manual is 4.73 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info