813472
20
Zoom out
Zoom in
Previous page
1/32
Next page
20
Installation Instructions
4. Gas Soundness Pressure Check
Having run the gas supply to the appliance, PURGE THE
SUPPLY PIPE, this is essential to expel any debris that may
block the gas controls.
4.1 Connect the gas to the 8mm elbow on the rear of the
appliance, see Diagram 10.
10
4.2 Connect a suitable pressure gauge to the test point located
on the inlet fitting and turn the gas supply on. Light the
appliance and check all gas joints for possible leaks. Turn
the appliance to maximum and check that the supply
pressure is as stated on the databadge. Turn the gas off
and replace the test point screw, turn the gas on and check
the test point for leaks.
5. Arrangement of Fuel Bed
Advice on handling and disposal
of fire ceramics
The fuel effect and side panels in this
appliance are made from Refractory Ceramic
Fibre (RCF), a material which is commonly
used for this application.
Protective clothing is not required when
handling these articles, but we recommend you
follow normal hygiene rules of not smoking,
eating or drinking in the work area and always
wash your hands before eating or drinking.
To ensure that the release of RCF fibres are
kept to a minimum, during installation and
servicing a HEPA filtered vacuum is
recommended to remove any dust
accumulated in and around the appliance
before and after working on it. When servicing
the appliance it is recommended that the
replaced items are not broken up, but are
sealed within heavy duty polythene bags and
labelled as RCF waste.
RCF waste is classed as stable, non-reactive
hazardous waste and may be disposed of at a
licensed landfill site.
Excessive exposure to these materials may
cause temporary irritation to eyes, skin and
respiratory tract; wash hands thoroughly after
handling the material.
6. Log Layout
6.1 The fuel bed consists of 5 logs and 2 ash panels. The logs
have letters A, B, C, D and E moulded into them for
identification.
6.2 Take the rear log A and place it up against the rear of the
appliance sitting on the 2 flat ledges of the burner. The 2
legs of the log should sit between the rear burner ports, see
Diagram 11. Ensure there is an equal gap between each
side of the log and the side of the firebox.
11
6.3 Place log B on the left hand side of the burner with the
location bar on the underside of the log fully located in the
long slot of the burner. Make sure the log is as far to the left
as possible, see Diagram 12.
12
6.4 Place log C on the right hand side of the burner with the
location bar on the underside of the log fully located in the
long slot in the burner. Make sure the log is as far right as
possible, see Diagram 13.
13
20


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Clarendon - Conventional Flue at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Clarendon - Conventional Flue in the language / languages: English as an attachment in your email.

The manual is 2.41 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info