2.7 CONDENSATE DRAIN
The condensate is discharged at the same pressure of the air entering the dryer.
Never point the condensate drain jet towards anybody.
The dryer comes already fitted with tubing in flexible plastics (6 mm or 10 mm diameter and 1500 mm long)
for the connection to the collection plant.
The condensate drain occurs through two solenoid valves; in order to avoid clogging of the solenoid valve,
the condensate coming from the separator is previously filtered, than discharged. The solenoid valve coil is
operated by DTT11 electronic instrument.
Connect and properly fasten the condensate drain to a collecting plant or container.
The drains cannot be connected to pressurised systems.
Don’t dispose the condensate in the environment.
The condensate collected in the dryer contains oil particles released in the air by the compressor.
Dispose the condensate in compliance with the local rules.
We suggest to install a water-oil separator where to convey all the condensate drain coming from
compressors, dryers, tanks, filters, etc.
3.1 PRELIMINARY OPERATION
Verify that the operating parameters matches with the nominal values reported on the data plate of
the dryer (voltage, frequency, air pressure, air temperature, ambient temperature, etc.).
Before delivery, each dryer is submitted to accurate tests simulating real operating conditions.
Nevertheless, the unit could be damaged during transportation. We therefore suggest to check the integrity
of the dryer upon arrival and to keep it under control during the first hours of operation.
The start-up must be performed by qualified personnel.
It’s mandatory that the engineer in charge will adopt safety operational conditions complying with
the local safety and accident prevention requirements.
The same engineer will be responsible for the proper and safe operation of the dryer.
Never operate the dryer if their panels are not in place.
3.2 FIRST START-UP
At the first start-up, or in case of start-up after a long inactivity period or following to maintenance
operations, respect the instructions given below. The start-up must be performed by qualified
personnel.
Sequence of operations:
Ensure that all the steps of the “Installation” chapter have been observed.
Ensure that the connection to the compressed air system is correct and that the piping is suitably fixed
and supported.
Ensure that the condensate drain pipe is properly fastened and connected to a collection system or
container.
Ensure that the by-pass system is open.
Ensure that the manual valve of the condensate drain circuit is open.
Remove any packaging and other material which could obstruct the area around the dryer.
Activate the mains switch.
Switch on the dryer by pressing the main switch on the control panel (pos. 1).
Ensure the consumption matches with the values of the data plate.
Allow the dryer temperature to stabilise at the pre-set value.
Switch-on the air compressor.
Check the piping for air leakage.
Check the proper operation of the condensate drains - wait for their first interventions.
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Finicompressors Artic 134-EVO luchtdroger at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Finicompressors Artic 134-EVO luchtdroger in the language / languages: English as an attachment in your email.

The manual is 1,04 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info