119529
14
Zoom out
Zoom in
Previous page
1/28
Next page
THE 455 D CONTROL PANEL
GENERAL DESCRIPTION
The FAAC 455 D control panel is used to operate the
following models.
Swing gate operators:
400 412
402 750
422 760
Barrier gate operators:
610/615
The 455 D programming controls the following:
Operating logic: A, S, E, EP, B, and C logics
available.
Reversing device behavior: Choose whether a
triggered reversing device during closing
immediately reverses gate movement or stops
the gate and reverses gate movement when no
longer triggered.
Torque or Pressure: Force adjustment for the
412 operator. Adjustable from 0 to 50.
Caution: For all hydraulic operators, the torque
must be programmed to the maximum (50)
setting.
Pause time between opening and closing:
adjustable from 0 to 240 seconds.
Opening/Closing time: adjustable
from 0 to 120 seconds.
Leaf delay on closing: adjustable from 0 to 4.1
minutes.
The 455 D control panel should be installed in an
enclosure that is conveniently located as close as
possible to the gate operator. All electrical
connections from the control panel to the operator
must be made in a weatherproof junction box.
The 455 D control panel requires a single-phase
power supply voltage (115 VAC [±10%] or 230 VAC
[+6 or -10%], 50–60 Hz). The power supply should be
protected by a 15 amp dedicated circuit breaker (not
provided).
The installer is responsible for grounding the
operator system, for providing the main power
breaker switch, and for making sure that the entire
gate system meets all applicable electrical codes.
The installer should refer to the installation manual
for a given operator for more information.
NOTE: An installation is U.L. compliant only
when you install the FAAC operators according
to the UL325 standards.
INSTALLING THE 455 D CONTROL
P
ANEL
Locate the control panel in the most convenient position
possible, considering the movement of the gate.
Installing the control panel consists of the following
general steps:
Connecting the main power to the control
panel
Connecting the activating device
Connecting the operator to the control panel
Checking the direction of the motor's rotation
Connecting other devices to the control panel
Set operating modes
CONNECT THE MAIN POWER SUPPLY
WARNING! Turn the main power off before you
make any electrical connections or before
programming.
Wire the main power supply to control panel terminals
in block J3 (see Figures 13 and 14). The installer is
responsible for insuring that a separate, grounded
circuit protected by a circuit breaker is between the
control panel and the main power supply. All wiring
should conform to applicable electrical codes, and all
wiring and fittings should be weatherproof and/or
suitable for burial.
Connect the ground to the grounding terminal in block
J3 and connect the power wires to the terminals labeled
N (neutral) and L (line).
N
OTE: For a 230V system, a neutral is not
needed. Connect one 115V line to the L (Line)
and a second 115V line to the N (Neutral).
Page 14
January, 2004
412 Operator And
455 D Control Panel Installation Manual
THE 455 D CONTROL PANEL INSTALLATION INSTRUCTIONS
14


Need help? Post your question in this forum.

Forumrules
1

Forum

faac-455

Reset search

  • Looking for set up program for 455A control board to FAAC 760 dual gate
    Submitted on 9-7-2023 at 01:41

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for FAAC 455 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of FAAC 455 in the language / languages: English as an attachment in your email.

The manual is 0,82 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of FAAC 455

FAAC 455 User Manual - Dutch - 12 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info