ENGLISH ENGLISH
N.B.: 1) Grease all pivots on brackets
2) If welding is not possible, the front and rear
bracket plates are also designed for fixing by
screws and screw anchors.
12) Fit the cover (fig. 7) on the operator as shown in fig. 8.
N.B.: Fix the guide support of the cover on the hole furthest
from the cap (fig.7).
13) Repeat the above operations to install the second operator.
14) Make the control unit connections.
15) Programme the control unit to set the specific installation
requirements.
Fig. 9
Fig. 10
SBLOCCA
DESBLOQUEAR
DEBLOQUE
UNLOCK
ENTRIEGELT
BLOCCA
BLOQUEAR
BLOQUE
LOCK
VERRIEGELT
SBLOCCA
DESBLOQUEAR
DEBLOQUE
UNLOCK
ENTRIEGELT
BLOCCA
BLOQUEAR
BLOQUE
LOCK
VERRIEGELT
4. TESTING THE AUTOMATED UNIT
On completing installation, affix a danger warning adhesive
label in a clearly visible position on the side of the operator (fig.
9).
Careful check operation of the operator and all accessories
connected to it.
Give the customer the “User guide” and demonstrate how to
use the operator correctly. Point out the potential danger
zones of the automated unit.
5. MANUAL OPERATION
In the event of a power failure or malfunction, the gate can be
operated manually by removing the plug and inserting the
special release key as shown in fig. 10.
To release the operator, turn the key in the direction of leaf
closing (fig. 10).
Open or close the leaves manually.
6. RETURNING TO NORMAL OPERATION
Turn off the electricity supply to the system before re-locking
the operators to avoid all risk of starting them accidentally.
To re-lock the operator, turn the key in the leaf opening
direction (fig. 10).
Fig. 7
Fig. 8
7. SPECIAL APPLICATIONS
There are no special applications.
8. MAINTENANCE
Carry out periodic checks of the gate structure and ensure in
particular that the hinges are in perfect working condition.
Check periodically that the electronic anti-crushing system is
adjusted correctly and that the release mechanism for manual
movement is fully operative (see relative paragraph).
Safety devices installed on the plant must be checked every
six months.
9. REPAIRS
For repairs, refer to authorised FAAC service centres.
5


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for FAAC 412 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of FAAC 412 in the language / languages: English as an attachment in your email.

The manual is 0,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info