The electrical connection must be performed by qualified personnel who install circuit breakers upstream of the appliance. Avoid installations with electric cables
that run close to fume pipes or hot components that are suitably insulated. The voltage is 230V while the frequency is 50Hz.
The electrical system, at the connection point, must include an earth connection as required by EEC Regulation 73/23 and EEC 93/98.
08.3 EXTERNAL THERMOSTAT
In this product it is possible to install an external thermostat. This operation may only be performed by authorised personnel. Use a 2-pole cable with everyday
double insulation. Connect the two poles to the connector of the CN7 pin 7-8 electronic board. Enable the external thermostat, changing the room temperature with
the P2 key until obtaining of the word T-E. On the home screen the room temperature will disappear and T-ON will be displayed when the thermostat requests
and T-OF when the thermostat is compliant. If the thermostat is closed, the appliance works at the set heat output. If the thermostat is activated, the appliance will
work in the MODULAT- state until it is switched off; if it is on MODE STAND-BY, it is activated.
08.4 IGNITION
The first procedure to be carried out is to connect the plug of the product to the mains; fill the pellet hopper (pay special care not to empty the entire bag at once,
but to carry out the procedure slowly so as not to introduce any pellet powder present in the bag into the hopper). If applicable, be careful not to damage the pellet
hopper door gasket and keep the support surface of the hopper clean.
Do not use pellets of poor quality. The use of substandard pellets can prevent the stove from reaching its maximum yield due to poor combustion and degradation
of the stove itself. Check that the door of the pellet hopper is fully and correctly closed otherwise the stove will not work properly. The ash collection drawer must
be closed before closing the firebox door otherwise the latter would not close. There is an end of stroke contact in the door that in case it is not closed correctly
removes the power supply to the auger tube and would send the stove into alarm.
Load the pellets, from the main menu carry out the LOAD INITIAL, and then switch on the stove.
The burn pot cleaning mechanism is present in the stove. Before loading the pellets, the stove activates this cleaning device so that the burn pot is always clean
and can reach the highest possible yield. This cleaning phase lasts on average 4 minutes. After cleaning, if all the mechanisms have successfully concluded their
cycle then LOAD PELLET will take place otherwise there will be an alarm that will interrupt the ignition phase.
IMPORTANT (ARIA 50)
It is very important that the piece shown is completely positioned in the ash recovery cone. If placed in the incorrect position or where absent, the appliance may
not work properly.
09. IR REMOTE CONTROL (IF INCLUDED OR SUPPLIED AS OPTIONAL)
IR Remote Control (OPTIONAL)
The control panel of the stove has been set up to receive a number of commands via remote control.
•On/off command: pressing the two buttons marked “1” and “6” simultaneously switches the stove on or off.
•Heat output adjustment: during normal working mode, pressing buttons “5” and “6” marked with a flame, sets one of the heat
output levels of the stove.
•Temperature adjustment: during normal working mode, pressing button “2” and then buttons “1” and “2”, marked with a
Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.
Product:
Forumrules
To achieve meaningful questions, we apply the following rules:
First, read the manual;
Check if your question has been asked previously;
Try to ask your question as clearly as possible;
Did you already try to solve the problem? Please mention this;
Is your problem solved by a visitor then let him/her know in this forum;
To give a response to a question or answer, do not use this form but click on the button 'reply to this question';
Your question will be posted here and emailed to our subscribers. Therefore, avoid filling in personal details.
Register
Register getting emails for Eva Calor ARIA 50 at:
new questions and answers
new manuals
You will receive an email to register for one or both of the options.
Get your user manual by e-mail
Enter your email address to receive the manual of Eva Calor ARIA 50 in the language / languages: English as an attachment in your email.
The manual is 7.33 mb in size.
You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.
If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.
The email address you have provided is not correct.
Please check the email address and correct it.
Your question is posted on this page
Would you like to receive an email when new answers and questions are posted? Please enter your email address.