4. The concrete works can be started at this point. First the area around the installation
pipe is concreted, where the pipe must remain accessible after the concrete works are
finished.
5. Once the concrete reaches the level of the frame, the concrete works continue through
the upper opening of the underground anchoring element, where the installation pipe is
placed. The entire space inside the frame must be filled with concrete. In the case of low
temperatures, the concrete must contain anti-icing additives,
6. The next step is precise levelling of the foundation and the concrete around the frame,
where the finishing tiles will be placed. Precise levelling of the underground anchoring
element is important for later installation of the charging station. After the construction
of the foundation is finished, the charging station can be aligned only with the use of
washers, placed on the bolts of the underground anchoring element,
7. The concrete must be left to dry for at least 48 hours (two days) before the cables are
inserted into the foundation and the charging station is installed on the foundation.
4.4 Installation of safety arches
The charging station manufacturer supplies optional safety arches. The safety arches have a
double function:
they prevent mechanical damage to the charging station which may result from
collisions with vehicles, and
they enable bikes and scooters to be chained to the arches while charging.
The manufacturer normally supplies a set of safety arches (1 or 2 pieces), which are installed
either at both sides of the charging station (2 arches) or in front of the charging station (1 arch).
If safety arches are added to the charging station, the foundation needs to be prepared in
advance, to add the safety arches to the same foundation as for the underground anchor.
4.4.1 Excavation and foundation construction for safety arches
If safety arches are added to the charging station, the foundation needs to be enlarged
accordingly (with the minimum dimensions of L: 80 cm x W: 50 cm x D: 60 cm).
24


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Etrel Gen 6 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Etrel Gen 6 in the language / languages: English as an attachment in your email.

The manual is 1.77 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info