798429
36
Zoom out
Zoom in
Previous page
1/76
Next page
EN-12 452166.66.14 · FD 0008 www.glendimplex.de
English LA 33TPR
7.2 Opening and closing covers
Each covering panel is secured with two screws. The screw
holes are closed with plastic covers. These plastic covers must
be inserted in the relevant screw holes again once the covering
panels have been mounted again. If the plastic covers are not
inserted, the function of the plate insulation may be impeded
due to rain water entering! Once the screws have been loos-
ened, the covering panels can be tilted (top plates by approx.
20°, bottom plates by approx. 45°). The bottom facade plates
can then be pulled out of the skirt panel, the top facade plates,
which do not have to be removed for transport, can be hung out
of the cover plate. Rehang the top panels by gently pushing
them in an upwards direction.
7.3 Connection on heating side
The connection on the heating side must be carried out by
trained personnel using personal protective equipment. Refer
to the device information for the connection sizes.
A spanner must be used to firmly grip the transitions when con-
necting the heat pump. After the heat pump has been installed,
the ductwork must be sealed so that the connection is gas-
tight.
CAUTION!
!
!
Flush the heating system prior to connecting the heat pump.
Before connecting the heating water system to the heat pump,
the heating system must be flushed to remove any impurities,
residue from sealants etc. Any accumulation of deposits in the
liquefier may cause the heat pump to completely break down.
Once the heat pump has been connected to the heating sys-
tem, it must be filled, purged and pressure-tested.
CAUTION!
!
!
The leakproofness of the hydraulic circuit must be ensured
and checked regularly.
NOTE
º
ºººº
The response pressure of the safety valve in the heat pump is
2.5 bar(g).
The following points must be observed when filling the system:
Untreated filling water and make-up water must be of
drinking water quality
(colourless, clear, free of sediments)
Filling water and make-up water must be pre-filtered (max.
pore size 5 µm).
Scale formation in domestic hot water heating systems cannot
be avoided, but in systems with flow temperatures below 60°C,
the problem can be disregarded. With high-temperature heat
pumps and in particular with bivalent systems in the higher per-
formance range (heat pump + boiler combination), flow tem-
peratures of 60°C and more can be achieved. The following
standard values should therefore be adhered to with regard to
the filling and make-up water according to VDI 2035, sheet 1:
the total hardness values can be found in the table.
Fig. 7.1:Guideline values for filling and make-up water in accordance with
VDI 2035
For systems with an above-average specific system volume of
50 l/kW, VDI 2035 recommends the use of fully demineralised
water and a pH stabiliser to minimise the risk of corrosion in the
heat pump and heating system.
CAUTION!
!
!
With fully demineralised water, it is important to ensure that
the minimum permissible pH value of 7.5 (minimum
permissible value for copper) is complied with. Failure to
comply with this value can result in the heat pump being
destroyed.
Important!
The notes/settings in the instructions of the heat pump man-
ager must always be observed and carried out accordingly; not
doing so will lead to malfunctions. The maximum water outlet
temperature must not exceed 64°C and must be secured on
the system side so that, if the temperature is exceeded, all addi-
tional heat sources are switched off safely.
20°
45°
Overall heat
output in kW
Total
Alkaline earths in
mol/m³ and/or
mmol
Specific system volume
(VDI 2035) in l/kW
< 20 20 < 50 50
Total hardness in dGH
< 50 2.0 16.8 11.2
< 0.111
50 - 200 2.0 11.2 8.4
200 - 600 1.5 8.4 < 0.111
> 600 < 0.02 < 0.111
1. This value lies outside the permissible value for heat exchangers in heat
pumps.
36


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Dimplex LA 33TPR at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Dimplex LA 33TPR in the language / languages: English, German, French as an attachment in your email.

The manual is 3.6 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info