17 Continued:
a. Check and correct, if necessary, the boiler for correct gas/air ratio set-up. Checking takes place on full and part
load, adjustment takes place only on the gas valve multiblock. For checking and adjusting are required: an
electronic CO
2
-gauge (on the basis of O
2
) and a gas pressure gauge. Note that the opening (see fig. 24) around
the measuring probe is sealed properly during measurement. Note also that measuring the O
2
levels in the flue
gas is necessary, because direct measurement of CO
2
can lead to inaccuracies due to varying CO
2
levels in the
natural gas. Connect the gas pressure meter between measuring point PG on the underside of the gas valve
multiblock and measuring point PL on the venturi (see fig. 23), ensuring the connections are gas tight.
a. Run the boiler at full load (forced mode ‘high’) by pressing the and [+]-key simultaneously for 2
seconds. The letter will now appear on the display.
b. When full load is reached, measure P gas at measuring point P on the underside of the gas valve
multiblock and at the measuring point PL on the Venturi and compare to the value in table 7 adjust if
necessary using the adjustment screw on the gas valve multiblock.
c. Check CO
2
- percentage (O
2
-percentage) against table 11. If the values exceed the given tolerances,
adjust according to fig. 23. Check the flame through the inspection glass, the flame must not blow off.
d. Run the boiler at part load (forced mode ‘low’) by pressing the and [-] keys simultaneously for 2
seconds. The letter will now appear on the display.
e. When part load is reached, measure P gas at measuring point P on the underside of the gas valve
multiblock and at measuring point PL on the Venturi and compare to the value in table 7 adjust if
necessary using the adjustment screw on the gas valve multiblock.
f. Check CO
2
-percentage (O
2
-percentage) against table 11. If the values exceed the given
tolerances, adjust according to fig. 23.
g. Remove measuring equipment and seal test points.
Check the flame through the inspection glass, the flame must not blow off. Repeat the check starting from
point 17b until the readings match the values in the tables. Contact our Service Department if deviations
cannot be corrected.
IMPROTANT SAFETY WARNING:
The installation of the boiler is not completed until all controls and safety device have been tested and
verified for correct function and operation. It is the sole responsibility of the installer to ensure that safety
control system and gas ignition system and any there safety control must be tested.
Gas Pressure Readings*
Boiler
Models
Full Load (100%)
Part Load (20%)
Δp [in w.c.] Δp [mbar] Δp [in w.c.] Δp [mbar]
310-5 5.20 ± 0.6 13.0 ± 1.5 0.28 ± 0.08 0.70 ± 0.20
310-6 4 ± 0.6 10 ± 1.5 0.18 ± 0.08 0.45 ± 0.20
310-7 3.80 ± 0.6 9.5 ± 1.5 0.20 ± 0.08 0.50 ± 0.20
310-8 5 ± 0.6 12.5 ± 1.5 0.30 ± 0.08 0.75 ± 0.20
310-9 6.20 ± 0.6 15.5 ± 1.5 0.32 ± 0.08 0.80 ± 0.20
Combustion Readings
Emission Unit
Full Load
(100%)
Part Load
(20%)
CO
2
Range
%
9.0 ± 0.5
CO
2
Set Point
%
9.0 ± 0.15
O
2
Range
%
4.8 ± 0.5
O
2
Set Point
%
4.8 ± 0.25
CO Limit
ppm
< 100
44


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for De Dietrich Gas 310 ECO at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of De Dietrich Gas 310 ECO in the language / languages: English as an attachment in your email.

The manual is 3,76 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info