577296
9
Zoom out
Zoom in
Previous page
1/83
Next page
01/2014
DUSPOL
®
digital
9
safety switch is done by testing the external conductor
(phase indication) to PE (earth). (figure F)
6. External conductor test (phase indication) (gure E)
- Fully grasp the handles L1
8
and L2
9
, in order to en-
sure a capacitive coupling to earth.
- Switch the voltage tester on by briefly actuating the push-
button
7
of the display handle L2
9
(remains switched
on for approx. 10 seconds!). When the device is switched
on, the display shows „0.0“.
- Apply the probe tip L2/+
3
to the system part to be tested.
During the single-pole external conductor test (phase in-
dication), make absolutely sure not to touch the probe tip
L1/-
2
and that it remains contactless.
- If the red LED K and the symbol O light up on the
LC display
6
, the external conductor (phase) of an AC
voltage is applied to this system part.
Note:
The single-pole external conductor test (phase indication)
can be carried out in an earthed mains from 230 V, 50/60 Hz
(phase to earth) on. Protective clothing and insulating condi-
tions on site might impair the function.
Attention!
The absence of voltage can only be determined by means of
a two-pole test.
7. Phase sequence test (gure G/H)
- Fully grasp both handles L1
8
and L2
9
, in order to en-
sure a capacitive coupling to earth.
- Apply the probe tips L1/-
2
and L2/+
3
to two external
conductors (phases) and check whether the external con-
ductor voltage of e.g. 400 V is applied.
- A clockwise phase sequence (phase L1 before phase L2)
is given, if the green LED „►“ of the phase sequence in-
dication
L
and the symbol of the phase sequence
indication
P
light up on the LC display
6
.
- A counter-clockwise phase sequence (phase L2 before
phase L1) is given, if the green LED „◄“ of the phase
sequence indication
L
and the symbol of the phase
sequence indication
P
light up on the LC display
6
.
- The phase sequence test always requires a countercheck
with the probe tips L1/-
2
and L2/+
3
being inverted dur-
ing which the phase sequence must change.
Note:
The phase sequence test can be carried out in an earthed
three-phase mains from 230 V - 900 V, 50/60 Hz (phase to
phase) on. Protective clothing and insulating conditions on site
might impair the function.
8. Continuity test (gure I)
- The continuity test must be carried out on system parts
which are free of voltage. If necessary, capacitors have to
be discharged.
- Apply the two probe tips L1/-
2
and L2/+
3
to the system
parts to be tested.
- In case of continuity (R < 100 kΩ), an acoustic signal is
emitted and the yellow LED Ω
M
for continuity lights up.
- This function also can be used to determine the conduct-
ing and non-conducting direction of semiconductor com-
ponents.
- If a voltage is applied to the test point, the voltage tester
automatically switches over to the voltage test function
and indicates this function.
9. Resistance measurement (gure J)
- The resistance measurement must be carried out on sys-
tem parts which are free of voltage. If necessary, capaci-
tors have to be discharged.
- Short-circuit the probe tips L1/-
2
and L2/+
3
and press
the push-button
7
of the display handle L2
9
once until
the symbol and „Ohm“ are shown on the LC display
6
. Display: „OL“ stands for a measured value which is
outside the measuring range.
- The resistance measurement function is active for approx.
10 seconds.
- Apply the probe tips L1/-
2
and L2/+
3
to the system
parts to be tested in order to measure resistances from
0.1 kΩ to 300 kΩ.
Note:
If required, it is possible to carry out a null balance with the
resistance measurement function being activated. For this pur-
pose, short-circuit the probe tips L1/-
2
and L2/+
3
and press
and hold the push-button
7
of the display handle L2
9
for
approx. 2 seconds until „0.0“ kΩ is shown on the LC display.
10. Diode test (gures K/L)
- The diode test must be carried out on system parts which
are free of voltage. If necessary, capacitors have to be dis-
charged.
- Short-circuit the probe tips L1/-
2
and L2/+
3
and press
the push-button of the display handle L2 twice until the
diode symbol and „diod“ are shown on the LC dis-
play
6
. Display: „OL“ VDC
- The diode test is active for approx. 10 seconds.
- Apply the probe tip L1/-
2
to the cathode and the probe
tip L2/+
3
to the anode of the diode to determine the con-
ducting-state voltage between 0.3 V and 2 V. In case of a
defective (broken down) diode, a voltage value of approx.
0.0 V will be displayed.
- In case of a diode tested in non-conducting direction, the
LC display shows „OL“.
11. Cable break detector (gure M)
- The cable break detector is intended for the non-contact
localization of cable breaks on exposed live lines.
- Switch the voltage tester on by briefly actuating the push-
button
7
of the display handle L2
9
(remains switched
on for approx. 10 seconds!). When the device is switched
on, the display shows „0.0“.
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Benning Duspol Digital at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Benning Duspol Digital in the language / languages: English, German, Dutch, Danish, French, Italian, Polish, Swedish, Turkish, Spanish, Norwegian, Finnish as an attachment in your email.

The manual is 14,29 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info