the critically stressed areas of the vessels are examined by
means of suitable testing methods, in order to ensure the
operating safety.
After having reached the total permissible number of
load cycles, the vessel must be exchanged and scrapped.
Record the number of load cycles in writing if you do not
have an automatic cycle-counter.
We recommend that aluminium vessels should be
exchanged after 15 years at the latest.
Please pay attention to and follow these measures, for
your own safety and that of you employees and cus
tomers!
In order not to unnecessarily load the pressure vessels
additionally, the non-return valves, that are meant to
avoid a drop in pressure, and also the pressure maintain
ing valves, which should reduce big pressure fluctuations
as well, should be checked regularly for internal and ex
ternal tightness and functionality.
Check the pressure vessels regularly on the inside and
outside for damage from corrosion.
Be particularly careful with second-hand pressure vessels,
when their previous operating mode is not specifically
clarified.
2.4. SAFETY REGULATIONS (EC; partly Germany,
only)
A compressor is identified by German law as being a filling
system if pressure cylinders are filled by the system, especially
when these cylinders are made available for third parties. The
start-up and operation of compressor systems for use as fill
ing stations is governed by the following regulations:
Pressure vessel directive (Directive 97/23/EC) of
29.05.1997
Operating safety regulations (BetrSichV) of 27.09.2002
Machine safety law (GSG) of 11.05.2001
14th regulation to machine safety law (14. GSGV - pres
sure vessel regulation) of 03.10.2002
If a high pressure compressor is used for filling pressure
vessels or for the supply of pneumatic systems, the following
regulations apply:
Accident Prevention Regulations (UVV):
BGV A1 of 01. January 2004
Copies of the above regulations are available through the
usual outlets, e.g. in Germany from:
Carl Heymanns Verlag
Luxemburger Str. 449
50939 Köln
Beuth-Vertrieb GmbH
Burggrafenstr. 4 - 7
10787 Berlin
The manufacturer has complied with all applicable regula
tions and the unit is prepared accordingly. If desired, we offer
at our Munich site a partial acceptance test according to §
14 BetrSichV. Please contact our Technical Service Depart
ment with regard to this. They can also supply our leaflet
“IMPORTANT NOTES FOR CERTIFICATION”.
According to the operation safety regulations (BetrSichV), all
compressor units which will be used as filling stations must
undergo an acceptance test by a professional at their loca
tion before bringing them into service. If pressure vessels
(bottles) are to be filled by the compressor for a third party
then the appropriate permission must be obtained from the
responsible authority before the acceptance test. As a rule,
this is the factory inspectorate. The procedure for obtaining
permission is according to TRG 730, guidelines for per
mission to set up and operate filling stations. The test certifi
cates and documents delivered with the compressor are im
portant and may be requested during the procedure for ob
taining permission. In addition, the documents belonging to
the unit are important for recurrent inspections and should
therefore be carefully kept.
Inspections in accordance with the regulations for preven
tion of accidents will be carried out by the manufacturer or
by a specialist.
No guarantees whatsoever are valid for damage caused or
favoured by the non-consideration of these directions for
use.
We strongly emphasize these regulations.
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Bauer Junior II at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Bauer Junior II in the language / languages: English as an attachment in your email.

The manual is 1,27 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Bauer Junior II

Bauer Junior II User Manual - German - 58 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info