810506
14
Zoom out
Zoom in
Previous page
1/120
Next page
13
EN
During the installation of the boiler must be ensured a safe distance of its surface from the
flammable materials depending on their flammability level:
Materials of flammability level B, C1 a C2 200 mm
Materials of flammability level C3 400 mm
Level of flammability was not proved according to STN 73 0853 400 mm
Examples of building materials division according to the level of flammability:
Level of flammability A not flammable (bricks, breez blocks, ceramic tile, mortar, plaster)
Level of flammability B partly flammable (heraclit, lignos, board made out of basaltic felt, novodur)
Level of flammability C1 hard flammable (broadleaf wood (beech, oak), plywood, werzali, hardened
paper)
Level of flammability C2 intermediate flammable (coniferous wood (pine, spruce), chipboard, so-
lodur)
Level of flammability C3 easily flammable (wood – fibre, polyurethan, PVC, soft foam, polystyrene)
The sealing board or protection covering (on the protected object) must exceed the boiler edge
at least for 300 mm. Also other items from flammable materials must be protected in this way, if
they are placed near the boiler and it is not possible to keep the safe distance.
If the boiler stands on the flammable surface, it must be protected by an inflammable, heat insu-
lating mat, which exceeds the ground plan on the side of the feeding door and ash tray door for
at least 100 mm. All materials of the flammability level A might be used as an inflammable, heat
insulating mat.
Boiler must be placed in a such way, ensuring sufficient space of at least 1 m from the front and
0,5 m from the left (right) and rear side. It is necessary to leave the space of at least 1 m above
the boiler.
This space is necessary for basic operation, maintenance and eventual service of the boiler. It is
not allowed to place the boiler in dwelling premises (including corridors).
WARNING: Items from flammable materials must not be laid on the boiler and in the
distance shorter than the permitted (safe) one. The boiler must be put out of operation,
if there is a danger of fire or explosion during the work (e.g. work with painting materi-
als, glues, etc.).
5.4 CONNECTION OF THE BOILER TO THE HEATING SYSTEM
Boiler ATTACK® SLX has to be installed in the system, which meets the requirements of the heat-
ing water quality as follows:
Country Number of standards Country Number of standards
Slovak republic STN 07 7401:1991 Switzerland SWKI 97 – 1
Austria ONORM H5195 – 1 Italy D.P.R. no. 412
Germany VDI 2035
For filling or refilling the water in the system might be used only water which is adapted for val-
ues according to STN 07 7401: 1992. Water has to be clear, colourless, without any suspended
substances, oils and chemical agressive additives and cannot be acidic (pH has to be higher than
7,2). Water hardness cannot exceed 1 mmol/l and concentration of Ca²Ѐ 0,3 mmol/l.
NOTICE: The warranty of the boiler is not valid in case of infringement of these conditions!
14


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATTACK SLX at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATTACK SLX in the language / languages: English as an attachment in your email.

The manual is 12.12 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of ATTACK SLX

ATTACK SLX Additional guide - English - 21 pages

ATTACK SLX User Manual - German - 112 pages

ATTACK SLX Additional guide - German - 21 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info