809224
10
Zoom out
Zoom in
Previous page
1/16
Next page
10
General information
Greenstar Danesmoor External 2022+ & External System 2022+– 6 721 844 015 (2022/01)
6.3 General notes
To get the best from your boiler, read these instructions
carefully.
Central heating system
During the first few hours of operation of the central heating
system, check that all radiators are being heated at an even
rate. If the top of a radiator is at a lower temperature than the
bottom then it should be vented by releasing air through the
venting screw at the top of the radiator. Ask your installer to
show you how this is done. Repeated venting will reduce the
quantity of water in the system and this must be replenished for
safe and satisfactory operation of the boiler.
When excessive venting or water leaks are found in the system
you must contact a service engineer to inspect the installation
and rectify any fault.
Only use additives compatible with the boiler and system. Use
of incompatible additives can cause damage and will invalidate
the boiler guarantee.
Condensate drain
This is a condensing boiler and the terminal will, at times give
out a plume of water vapour. This is quite normal.
The boiler also produces quantities of condensate which is
discharged regularly via a pipe to drain.
This pipe must not be blocked or altered in any way.
Clearances, see section 6.2
Your installer will have provided adequate space around the
boiler for safety and servicing access.
Do not restrict this space with the addition of trellises, fences
etc. next to the boiler.
Room thermostat
A room temperature controller must be fitted to control the
central heating. Refer to instructions supplied with the
thermostat for information on siting and setting.
Thermostatic radiator valves
It is recommended that this type of valve is fitted to all but one
of the radiators (or at least those in the sleeping
accommodation). The remaining radiator, which must be
where the room thermostat is located, should be un-controlled
and must be left open.
10


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Worcester-Bosch Greenstar Danesmoor External Regular - External System at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Worcester-Bosch Greenstar Danesmoor External Regular - External System in the language / languages: English as an attachment in your email.

The manual is 1.07 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info