Commissioning
6720813171 (2016/05)38
Open the heating flow and return isolating valves on the pump group
(open position: parallel to the pipe).
Fig. 75 Opening the isolating valves (here: open position)
Read the pressure from the pressure gauge on the pump group or on
the control panel of the BC10.
The pressure in the heating system, which is measured directly at the
boiler, must be at least equal to the required pre-pressure of the
expansion vessel plus 0.5 bar. This minimum pressure must not be less
than 1.0 bar (if the heating system is cold). The maximum pressure in
the heating system, measured directly at the boiler, must not exceed
3.5 bar.
Fig. 76 Reading the pressure gauge
Purge the heating system via the air vents on the radiators. Start at
the lowest floor of the premises and then work your way up from floor
to floor.
Fig. 77 Purging the heating system
If the boiler has been in use for approximately one week and the pressure
reading on the display is less than 1.0 bar, the system has to be topped
up.
The pressure loss in a heating system is caused by air bubbles escaping
via fittings and (automatic) air vent units. The oxygen contained in the
fresh heating water will also escape from the heating water after some
time and cause the pressure in the heating system to drop.
This explains why it is normal that the heating system must be topped up
a couple of times after commissioning it. Eventually the system will have
to be topped up on average once a year.
Should it be necessary to top up the heating system more frequently,
water is probably escaping due to a leakage in the system or a defective
expansion vessel. In this case the cause of the water loss must be
repaired as soon as possible.
10.1.2 Filling the condensate trap with water
Fill the condensate trap with water.
Fig. 78 Filling the condensate trap with water
10.2 Testing and measuring
10.2.1 Checking for gas leaks
Prior to the initial start-up check that the gas supply pipework is gas-
tight; this must be confirmed in the commissioning log book.
6 720 648 726-075.1TD
P1
0
1
6 720 648 726-076.1TD
6 720 648 726-077.1TD
DANGER: Danger of fatal accident from explosive
fumes.
Pipes and fittings may leak after commissioning and
maintenance activities have been carried out.
Carry out a correct leakage test.
Only use approved leak detection spray to locate
leaks.
CAUTION: Damage to the installation due to short
circuits
Cover any hazardous locations prior to locating the
leaks.
Do not spray the leak detection product on cable
runs, plugs or electrical wiring. Do not let it drip onto
them either.
6 720 648 726-016.1TD
38


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Worcester-Bosch GB162-80 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Worcester-Bosch GB162-80 in the language / languages: English as an attachment in your email.

The manual is 5,43 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Worcester-Bosch GB162-80

Worcester-Bosch GB162-80 Installation Guide - English - 12 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info