484572
36
Zoom out
Zoom in
Previous page
1/74
Next page
30
CAUTION: If the PID display does not illuminate or shows odd, unreadable characters which do
not clear in a few seconds, turn the power switch to “Position 0”, unplug the machine, and contact
your reseller for technical support.
NOTE: The indicator lamp to the LEFT of the brew pressure gauge on the right side of the front
panel will never be illuminated if you are using the plumbed option.
16 Glance under the machine occasionally for signs of water leakage. If water shows under the machine, first
unplug the power cord and then turn the machine off before assessing the situation. If source of the leak
cannot be determined and eliminated, contact your reseller for assistance. Damage caused by water leaks
is not covered by the warranty.
WARNING: Water leaking from the machine may indicate that a potentially hazardous situation
exists. If water is leaking, first unplug the machine, then turn the power switch to “Position 0”,
and turn off the water supply valve at the source. Discontinue use until the source of the leak is
determined and mitigated.
17 If everything seems as it should be at this point, lift the brew lever again. The pump should start (it can be
heard) and a stronger flow of water should come from the group. Lower the lever fully and the pump should
stop.
Brew Boiler Warm Up
WARNING: In normal use the group will become very hot. Parts of the metal can be over 200° F.
(93 c.). Touching the group, even briefly, can cause serious burns. Use great caution around all hot
parts of this machine!
Allow the machine to heat up. The temperature of the brew boiler as indicated on the PID’s display should
be moving upwards. When the PID display reaches around 200° F. (93 c.) Do another check for leaks, and
if everything looks dry, run about 16 ounces (.5 L.) through the group by lifting the brew lever. Catch some
of the water in a suitable container and check the water for any unnatural odors. Repeat until any odors are
gone.
NOTE: It is necessary to flush out the brew boiler to remove any contaminates or bad tastes and
smells from the manufacturing process that may linger. This will take approximately 16 ounces
(.5 liters), or maybe a bit more. Even though this may not be necessary if correctly completed in
Chapter 10, it will help remove any air in the lines which was introduced when switching water
sources and connecting the plumb water hose.
WARNING: The water that comes from the brew group can be over 200° F. (93 c.). Serious burns
can result from contact with this water. Use caution!
Steam Boiler
Now that the brew boiler is operating correctly and has been flushed clean, it is time to do much the same
for the steam boiler. Check that both the steam and hot water valves are closed and turn the power switch to
Position II.You have now energized the steam boiler which supplies steam to the steam valve (on the left
front of the machine) and hot water (to the valve on the right front of the machine).
WARNING: The water that comes from the brew group can be over 200° F. (93 c.). Serious burns
can result from contact with this water. Use caution!
Allow about five or ten minutes for the steam boiler to heat up. You may notice some sounds during this
time as the water in the steam boiler heats. A bit of hissing early on until the vacuum relief valve closes is
normal. This steam and possibly a small amount of water is vented into the drip tray through the metal tube
on the left side of the back of the tray.
36


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Vibiemme Vibiemme Double Domobar version 3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Vibiemme Vibiemme Double Domobar version 3 in the language / languages: English as an attachment in your email.

The manual is 7,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Vibiemme Vibiemme Double Domobar version 3

Vibiemme Vibiemme Double Domobar version 3 Additional guide - English - 3 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info