484572
12
Zoom out
Zoom in
Previous page
1/74
Next page
6
Pressure Builds
14 The infusion valve is pushed open by the pressure of
the incoming water (direction of flow indicated by the
blue arrows). The space below the infusion valve begins
to fill with water. During the time it takes to fill this void,
the pressure in the entire brew path cannot exceed that
which is determined by the force of the spring which
normally holds this valve in the closed position. This
water at low pressure is pre-wetting (“infusing”) the cof-
fee at this time.
15 The exhaust valve at the bottom of the group is held by
a much stiffer spring which exerts a force greater than
the brewing pressure. This valve will remain closed, as
seen here, until the user lowers the lever back to the ful-
ly-down, “at rest” position.
16 Once the infusion chamber is completely filled, the en-
tire brew path reaches the maximum brewing force from
the pump. This increase in pressure will be obvious if
you are watching the brew pressure gauge.
17 When that equilibrium in pressure is achieved, the in-
fusion valve will close, and it will stay in that closed
position for most of the extraction process, as long as the
pressure above and below that valve are equal.
18 Pressure also builds over the coffee at this time, and
now the extraction begins in earnest.
15
14
16
17
18
12


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Vibiemme Vibiemme Double Domobar version 3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Vibiemme Vibiemme Double Domobar version 3 in the language / languages: English as an attachment in your email.

The manual is 7,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Vibiemme Vibiemme Double Domobar version 3

Vibiemme Vibiemme Double Domobar version 3 Additional guide - English - 3 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info