484572
11
Zoom out
Zoom in
Previous page
1/74
Next page
5
The Inner Workings of the E-61 Group
The E-61 group has been around for over five decades, and it continues to be one of the most effective
group designs in the industry. Why? Because it is simple, easy to service, and effective. In the following dia-
grams we explain the basic operation of this marvelous design.
At Idle
1 The brew lever is in the fully-down position.
2 The cam inside the group, rotated by the movement
of the brew lever, is in a position that allows the upper
brew valve to be closed by the pressure of its spring.
The machine is idling (turned on, but not being presently
used).
3 The upper, hollow portion of the group is filled with
heated water from the boiler.
4 Water in the boiler is heated and becomes less dense. It
rises to the top of the boiler, making its way into the top
of the group by a convection current through the upper
thermosyphon pipe shown in the diagram on the previ-
ous page. The thermal energy held by the water is trans-
ferred to the massive brass casting.
5 The water cools as it releases its thermal energy, increas-
es in density, and “sinks” to the bottom of the chamber.
6 The denser water passes out of the group, through the
lower thermosyphon tube, and returns to the bottom
of the boiler and begins it journey all over again. This
convection current continues as long as the machine re-
mains in its idling state, keeping the group heated, and
ready to use.
Brew Mode Begins
7 The brew lever is lifted fully by the user. This action
closes the contacts of the microswitch on the front of the
DD (switch not shown) and the pump starts.
8 The cam is rotated by that movement of the lever, and
the brew valve is pushed open.
9 The cam has moved away from the infusion valve and
the two lower valves are closed by their springs.
10 The pump has started and water is forced through the
boiler into the group through both thermosyphon tubes.
11 Water passes through the filter screen, and then through
the gicleur (“Jet” - a brass screw with a small calibrated
hole through it), which is the only path water can take
into the mushroom.
12 Water passes through the inside of the “mushroom”
and pressure begins to build in all the areas where there
is water as indicated by the light blue color in this dia-
gram. The coffee is being “infused” with hot water.
13 Once the pressure of the water reaches about 1.5 BAR
the infusion valve opens.
The numbers in the illustrations refer to the red numbers in the text below to make it easier to follow along:
3
4
6
5
2
1
8
9
10
11
12
13
7
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Vibiemme Vibiemme Double Domobar version 3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Vibiemme Vibiemme Double Domobar version 3 in the language / languages: English as an attachment in your email.

The manual is 7,23 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Vibiemme Vibiemme Double Domobar version 3

Vibiemme Vibiemme Double Domobar version 3 Additional guide - English - 3 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info