631211
9
Zoom out
Zoom in
Previous page
1/44
Next page
Exhaust duct
Only the Truma AA 24 exhaust duct (part no. 39420-00) and
the ZR24 combustion air intake duct (part no. 39440-00) may
be used for the device , since the device has only been tested
and approved with these ducts.
Do not crush or kink ducts during installation.
Figure 3
Permissible duct lengths with wall cowl:
30 – 150 cm. Duct lengths of up to 50 cm can be laid with any
amount of upslope or with a downslope of max. 5 cm. To pre-
vent the ingress of water as much as possible, lay the ducts
(as shown in Figure 3) in a curve.
Connecting the exhaust double duct to the
device
Push the clamp (7) over the ducts.
Compress the exhaust duct (1) at its beginning so that the
coils are lying against each other.
Slide the clamp (4) over the exhaust duct (1).
Slide the exhaust duct (1) over the O-ring (2a) on the con-
nection (2) as far as the collar (3).
Hook in the clamp (4) and screw it securely into place. Slide
the combustion air intake duct (5) onto the connection (6)
and secure with the clamp (7).
Figure 4
A new O-ring must be fitted whenever the exhaust duct
has been removed!
Selecting a location
The device must always be installed in such a way that it is
easy to access at all times for service work, and also easy to
remove and install.
Position the boiler in such a way that the cowl can be fitted to
an outer surface that is as straight and smooth as possible.
The wind must be able to flow around this outer surface at all
sides, and no decorative strips or panels should be present
there if possible, otherwise place the boiler on a suitable base.
The wall cowl must be attached such that there is no fuel tank
filler neck or fuel tank breather opening within 500mm (A).
There must also be no living area ventilation openings within
300 mm (A). If the cowl has been placed vertically beneath
an opening window, the boiler must be equipped with an au-
tomatic shut-off device in order to prevent operation with the
window open.
Window
Floor
300 mm
300 mm
protected
area
protected
area
A
Figure 1
The boiler must not be installed close to or directly behind a
room heater.
In order to ensure that there is sufficient ventilation to cool
the electronics, the gap between the electronics cover (34)
and the walls of furniture items in which the boiler is installed
must be at least 20mm.
Installing the boiler
2
3
1
45º
20 mm
Figure 2
Set up the boiler on a suitable horizontal surface.
Attach the hose (2) to the 10 mm duct connection as far as
possible and fix it with a hose clamp (3). Lay the hose(2)
downwards or horizontally through the caravan floor to
drain directly to the outside. The hose must not be bent or
squeezed (use a hose guide if necessary).
Cut off the hose about 20 mm below the vehicle floor at a
45°angle relative to the direction of travel.
Securely screw the boiler to the retaining bracket (1).
9
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Truma BGF 10 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Truma BGF 10 in the language / languages: English, German, Dutch, Danish, French, Italian, Swedish as an attachment in your email.

The manual is 5,69 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Truma BGF 10

Truma BGF 10 User Manual - English, German, Dutch, Danish, French, Italian, Swedish - 44 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info