600937
22
Zoom out
Zoom in
Previous page
1/37
Next page
22
Electric boiler operation is very simple and fast and does not require any special qualification. The boiler can
be nevertheless controlled only by adults who have been demonstrably explained the boiler function and
operation. This demonstration must be performed by the worker who carried out the installation and set the
boiler into operation.
If the display is turned on, the control supply voltage is fed to the boiler.
Set the room thermostat (or other control element) to the required temperature.
Display the current heating water temperature by pressing the Arrow Up button. To switch on the boiler
press the O/I button in the heating temperature setting section. Concurrently, the circular pump is
switched on which runs for the period defined by the set parameters. The heating function is indicated
by the LED pilot light in the left section of the control panel = “HEATING”.
After the set temperature has been reached, the automatic controlling system gradually switches off the
heating bodies in order to maintain the heating water temperature within the range specified by the
parameters.
First heating: maintain the highest possible service temperature of the heating medium in the system for
the first four hours. The system must be carefully deaereated while in operation to rid it reliably off the
remaining air after the previous bleeding in the cold state. When the system cools down, refill it with
water.
If a power outage (or MRC signal interruption) occurs, the boiler is shut down. When the power supply
is renewed, the electric boiler restarts its operation.
No objects can be placed on the jacketing or inside the electric boiler. Cleaning of the electric boiler
external surface is recommended only by a damp cloth.
It is recommended to bleed the heating system regularly and remove the deposited impurities by
discharging small amounts of the liquid through the discharge cock assuring that also sediments at the
bottom of the boiler vessel are washed out.
Switch off the boiler after the end of the heating season by the circuit breaker. It is recommended to
start the boiler for roughly 30 seconds every month to spin the pump outside the heating season.
Minimum water pressure at the circular pump inlet must be 5 kPa (the water temperature must not
exceed 75°C).
Check whether the air charge pressure specified on the expansion vessel label is sufficient for the
heating system (system static height of 5 m corresponds to the air charge pressure of 50 kPa, 10 m =
100 kPa, 15 m = 150 kPa) prior to the boiler connection to the heating system.
Setting the pressure in the expansion vessel
When the system is filled with the heat carrier and properly vented, write down the displayed system water
pressure value. Correct the air charge pressure in the expansion vessel to the same value by bleeding. Adjust the
system pressure value to at least 10 kPa by filling more water into the system. If the air charge pressure in the
expansion vessel is not correctly adjusted, similar defects big changes in pressure during operation occur as
in the case of an insufficiently rated expansion vessel.
Maintenance
Regular maintenance is very important for a reliable operation and high durability of the boiler and its
components. The user is recommended to contact the manufacturer via a local authorized service organization
and ensure regular inspections after every year of operation (which is one of the conditions for warranty
acknowledgement). Service engineer will also carry out an inspection of the control and safety elements of the
boiler. To safeguard faultless heating system service, it is necessary to regularly check the initial water pressure
in the cold state. Shall any drop in pressure occur, the heating system must be replenished with water.
The outer jacketing can be cleaned by a dishcloth dipped in soap-suds and subsequently dried.
22


Need help? Post your question in this forum.

Forumrules
1

Forum

thermona-therm-el-15

Reset search

  • I Have an EL15 and cannot see how to connect a 3 way motorised valve. Manual shows position on diagram but how is connection physically made? Please help Submitted on 28-9-2022 at 18:47

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Thermona THERM EL 15 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Thermona THERM EL 15 in the language / languages: English as an attachment in your email.

The manual is 0,87 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info