532674
22
Zoom out
Zoom in
Previous page
1/54
Next page
Page.22
Inspect
Work activities OK
1 General inspection a The main burner should ignite smoothly (within several seconds) and not give a bang sound due to
delayed ignition. Go to number 7 if there appears to be delayed ignition.
b Check the flame image. No flames against the glass. The flame image should be stable.
The flame should be yellow after approximately 15 minutes; go to number 7 if the flame image is
blue.
c Check for excessive formation of soot on the inside of the glass/combustion chamber and on decora-
tive parts.
Go to number 7 if there is excessive formation of soot.
2 Door/front a check for obstructions in the convection air openings
3 Glass window, seal. a check the glass window for cracks etc. Replace if damaged, cracked, or broken.
b check the seal of the glass window; this needs to join the unit and glass window. Replace if required.
c check any hinges, seals, quadrants etc.
d clean the glass. Check there is an even (not too large) load on the glass window. Prevent point load.
4 Gas control compart-
ment and convection
part of the unit
a clean these areas with a vacuum cleaner. Do so carefully. Remove parts that do not belong here.
b check if the convection airflow is free.
5
a remove decorative parts and clean the burner (be careful with ceramic burners!) with a vacuum
cleaner.
Decorative parts (logs/
pebbles etc.) and
(pilot) burner
b inspect decorative parts for damage/cracks/discolouration and clean with a soft brush if required.
c check if the burner cover is intact and free of corrosion. Replace the burner if required.
d after completing the inspection: replace decorative parts, exactly as stipulated by the manufacturer.
Ensure the pilot burner is kept free!
e check if the pilot flame protection is intact (if applicable).
f check the piezo for sufficient spark power, and ensure the ignition cable is free from metal parts/
electrical parts.
6 Combustion chamber a check the condition of the finishing, such as varnish and enamel. Check for corrosion. Repair if re-
quired.
b
replace the unit if there are holes. Close the unit for further use.
c check overpressure hatches or overpressure construction for sealing and sufficient movement/deposits.
7 Ignition and operation
of the main burner
a remove the burner from the unit and check whether the main injector is dirt-free.
b check if the primary ventilation opening in the main burner is dirt-free.
c mount the burner and check if the burner is in a good position in relation to the pilot burner.
d check if the burner is fixed and cannot move.
e check if the pilot burner burns well, with a blue flame (blue only).
f check if the burner ignites uniformly across the entire surface and without significant delay.
g check if the flame image is uniform and stable.
h check the initial and burner pressure. Do not forget to close the pressure measuring points.
i check if gas control parts are intact, and that plastic parts have not melted, for example.
j check electrical wiring for damage and ensure they are away from hot parts of the unit.
8 Installation a
check if convection grates are dust-free and dirt-free.
b check if there is sufficient distance between the unit and flammable furniture.
9 Flue tube/air supply a where possible, inspect the general state of the exhaust/supply system and check for blockages /
leaks / corrosion.
b check the outlet, which should be free from dirt and blockages.
c check the outlet, which should be free from dirt and blockages.
10 Remote control a check for correct functioning of the remote control.
11 Ventilators (if present) a clean the convection ventilators and check for correct functioning.
10. Maintenance activities. .
Please note: turn off the gas supply and power supply as much as possible during maintenance activities.
Maintenance activities should be performed by a qualified fitter.
Close the gas tap while maintenance activities are being performed.
22


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Thermocet Trimline 6345 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Thermocet Trimline 6345 in the language / languages: English as an attachment in your email.

The manual is 3,16 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Thermocet Trimline 6345

Thermocet Trimline 6345 Usermanual and installation guide - Dutch - 54 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info