782626
14
Zoom out
Zoom in
Previous page
1/24
Next page
10
3. Service and maintenance.
3.1 Adjustment
Adjustment can only be done by qualied personnel.
All maintenance and maintenance of the system and safety components shall
be subject to debugging.
Before boiler start
Open the stop valve between all boiler and system.
Water injection into the system to ensure that all air in the boiler and system is
discharged from the automatic exhaust valve of the boiler and heating system.
Check whether the heating system, hot water system, connector and boiler are
leaking.
Check whether the boiler's power connection is correct.
Check whether the boiler grounding is good.
Check to see if there are any corrosive liquids or articles near the boiler.
Boiler start-up
Close boiler power switch.
Set the winter mode and make sure that the indoor temperature controller is closed,
when the heat tube in the heat exchanger works, the boiler starts to run
automatically and is controlled by the regulation and safety control.
the running process is without power, the heating tube stops heating, and the wall
hanging when the power supply is restored will start heating.
During running, the power is o, the heating tube stops heating, and the boiler
will start heating when power is restored.
Run time check
Check the circulation between boiler and heating system.
Check whether the boiler works well by opening a closed room temperature
controller or timer.
Turn o
Press 5S.
The boiler turn o, but the PCB is still supplied power.,
The heating function is stopped, display ;The anti-freeezing is on line.
When shut down the power of the boiler , the anti-freezing function will failure.
In winter, if long time not to use the boiler, please empty the water of system
avoid to freezing, or inject antifreeze in the system.
14


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Thermex Eurostar at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Thermex Eurostar in the language / languages: English as an attachment in your email.

The manual is 1.97 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info