744247
23
Zoom out
Zoom in
Previous page
1/53
Next page
GB
GB 23
2.3.7.6 INTEGRATION IN A HEATING SYSTEM
Please note: The Senso M H2O / Piko H2O must only be installed after detailed
planning of the overall heating system in accordance with the relevant rules
of technology and the safety standards. Proper configuration of the pumps,
fittings, pipeline, buffer tank and the safety components is the responsibility
of the planning firm and/or of the company in charge of installation. For
heating lines, we recommend a minimum nominal diameter:
copper pipe of 22 x 1.0 mm, or 3/4" for steel pipe.
With cold water pipes, a pipe diameter (copper pipe) is 15 x 1.0 mm and a
flow pressure of 2.0 bar is sufficient for safe operation.
However, dimensioning of this pipework must be carried out by the specialist
company in charge, taking due account of on-site conditions.
Integration of the Senso M H2O / Piko H2O can be carried out based on the
diagram on the next page.
A buffer tank must be connected up. German legislation 1st and 2nd BImSchV
mandates the design of volume for this buffer tank. This regulation specifies
that for each kW water capacity, at least 55 liters of buffer volume must be
kept.
Senso M H2O
For the Senso M H2O, these are: 5.0 kW x 55 litres / kW = 275 litres.
Piko H2O
For the Piko H2O, these are: 4.6 kW x 55 litres / kW = 253 litres.
Since these are not normal market sizes, the next larger buffer tank should be
chosen with 300 or 500 litre capacity.
°C
C21
L' NPE
PE
N
L
E
E
F
F
A
B
D
C
°C
C21
L' NPE
PE
N
L
E
E
F
F
A
B
D
C
A = The yellow-green wire is wired to the protec-
tive conductor (earth) (PE) of the feeder
B = thermostat as a pump control,
with approx. 3.0 m connecting line
2 x 0.75 mm2
C = return flow temperature boost (circulation
pump)
D = terminal 1 not necessary!
E = phase (L) brown line
F = switched phase (L`) blue line
Blue
yellow/
green
Brown
23


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Spartherm Passo L at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Spartherm Passo L in the language / languages: English as an attachment in your email.

The manual is 3.7 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Spartherm Passo L

Spartherm Passo L User Manual - German - 52 pages

Spartherm Passo L User Manual - Dutch - 53 pages

Spartherm Passo L User Manual - Dutch - 44 pages

Spartherm Passo L User Manual - French - 53 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info