744247
51
Zoom out
Zoom in
Previous page
1/53
Next page
GB
GB 51
Moro Noto Passo XS Passo S Passo M Passo L
optional RLA and RLU /
RLA (Export) RLU RLA and RLU /
RLA (Export)
RLA and RLU /
RLA (Export)
RLA and RLU /
RLA (Export)
CAPACITY
Nominal output kW 5,0 / 12,0 7,0 5,0 6,1 / 10,0 6,1 / 10,0 6,1 / 10,0
Efficiency % > 80 > 80 > 80 80 / 78 80 / 78 80 / 78
Min./max. heating capacity kW
3,5 - 6,5 / 8,4 - 15,6
4,9 - 9,1 3,5 - 6,5
4,3 - 7,9 / 7,0 - 13,0 4,3 - 7,9 / 7,0 - 13,0 4,3 - 7,9 / 7,0 - 13,0
Power distribution air / H20 %------
Power distribution air / H20kW------
Room heating capacity
favourable, approx. m3124 / >186 186 124 165 / >186 165 / >186 165 / >186
less favourable, approx. m373 / <186 120 73 95 / <186 95 / <186 95 / <186
unfavourable, approx. m348 / 130 82 48 65 / 130 65 / 130 65 / 130
Mass flow of flue gas at NW g/s 3,9 / 7,2 5,5 7,22 5,8 / 8,0 5,8 / 8,0 5,8 / 8,0
Flue gas temperature on the flue gas outlet C 337 / 255 340 255 312 / 387 312 / 387 312 / 387
Min. supply pressure at NW Pa 11 12 12 12 12 12
WEIGHT
Steel kg - - 125 160 225 165
Buffer tank, steel, side kg - - - - - -
Ceramic kg - - - - - -
Sandstone kg 240 210 - - - -
Soapstone kg 280 245 - - - -
Buffer tank, top kg - - - - 60 / 60 -
OPTIONS
Flue gas pipe outlet, at top 
back 
FUNCTIONS
Rotation ˚ - - on request - - -
Buffer tank ----
Separate combustion air 
Door closure hinged hinged hinged hinged hinged hinged
TESTS | APPROVALS
DIN EN 13240 
1. BImSchV. / 2. BImSchV. / / / / / /
Aachen / Munich / Regensburg Regulation 
DIBt room-air-independent / - - / - / - / -
DIBt approval no.
Z-43.12-397
- Z-43.12-364
Z-43.12-397 Z-4 3.12-397 Z-43.12-397
Art. 15 a B-VG (Austria) / - / - / - / -
VKF: no. (Switzerland) - - ---
51


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Spartherm Passo L at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Spartherm Passo L in the language / languages: English as an attachment in your email.

The manual is 3.7 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Spartherm Passo L

Spartherm Passo L User Manual - German - 52 pages

Spartherm Passo L User Manual - Dutch - 53 pages

Spartherm Passo L User Manual - Dutch - 44 pages

Spartherm Passo L User Manual - French - 53 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info