687275
17
Zoom out
Zoom in
Previous page
1/68
Next page
LED Status Explanation
Green LED flashing: 2s on
2s off
Waiting for connection conditions
The conditions for feed-in operation are not yet met. As
soon as the conditions are met, the inverter will start feed-
in operation.
flashing: 1.5s on
0.5s off
Secure power supply operation
The secure power supply operation is activated and the in-
verter supplies the outlet with current from the PV system.
flashing quickly Update of central processing unit
The central processing unit of the inverter is being up-
dated.
glowing Feed-in operation
(Power: ≥90%, relative to the active power limit set)
The inverter feeds in with a power of at least 90%.
pulsing Feed-in operation
(Power: ≥ 20% to max. 90%, relative to the set active
power limit)
The inverter is equipped with a dynamic power display via
the green LED. The green LED pulses faster or slower, de-
pending on the power. If necessary, you can switch off the
dynamic power display via the green LED.
Red LED glowing Event occurred
In addition to the glowing red LED, the display indicates
the following information about the event:
Event type
Event number
Date and time at wich the event occurred
Blue LED flashes slowly for
approx. one
minute
Communication connection is being established
The inverter is establishing a connection to a local network
or is establishing a direct connection to an end device via
Ethernet (e.g. computer, tablet PC or smartphone).
flashes quickly for
approx. two min-
utes
WPS active
The WPS function is active.
glowing Communication active
There is an active connection with a local network or there
is a direct connection with an end device via Ethernet (e.g.
computer, tablet PC or smartphone).
3 Product Description
SMA Solar Technology America LLC
User Manual 17SB30-77-1SP-US-40-BA-en-11
17


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for SMA Sunny Boy 6.0-US at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of SMA Sunny Boy 6.0-US in the language / languages: English as an attachment in your email.

The manual is 2,73 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info