9.11 Deactivating Grounding Conductor Monitoring
If the inverter is to be installed in an IT network or another grid configuration in which deactivation
of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring
as follows.
The basic procedure for changing operating parameters is explained in another section (see
Section9.1 "Changing Operating Parameters", page53).
Procedure:
In the parameter group Grid monitoring > Grid monitoring > Country standard set the
parameter PE connection monitoring to Off.
9.12 Configuring Feed-In Management
If required by the grid operator, the inverter can provide grid management services. You can
configure these via the inverter feed-in management. Coordinate the configuration of the feed-in
management with your grid operator beforehand.
The basic procedure for changing operating parameters is explained in another section (see
Section9.1 "Changing Operating Parameters", page53).
Procedure:
1. Activate the user interface (see Section8.1, page44).
2. Log into the user interface as an Installer.
3. On the right-hand side of the menu bar, select the menu User Settings (see Section8.3 "Start
Page Design of the User Interface", page49).
4. In the subsequent context menu, select [Start the installation assistant].
5. Select [Save and next] until you arrive in the menu Feed-in management.
6. Configure the feed-in management as desired.
9 Configuration of the Inverter
SMA Solar Technology AG
Operating Manual 59SB30-50-1AV-40-BE-en-10
59


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for SMA Sunny Boy 5.0 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of SMA Sunny Boy 5.0 in the language / languages: English as an attachment in your email.

The manual is 2,56 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of SMA Sunny Boy 5.0

SMA Sunny Boy 5.0 User Manual - German - 104 pages

SMA Sunny Boy 5.0 User Manual - Dutch - 102 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info