687262
58
Zoom out
Zoom in
Previous page
1/100
Next page
Procedure:
To switch on the WLAN direct connection, in the parameter group PV system
communication > WLAN, select the parameter Soft-access-point is turned on and set this
to Yes.
To switch on the WLAN connection in the local network, in the parameter group System
communication > WLAN, select the parameter WLAN is turned on and set this to Yes.
9.9 Switching the Dynamic Power Display Off
As standard, the inverter signals its power dynamically via the pulsing of the green LED. When
doing so, the LED flashes on and off uniformly or is permanently lit at full power. The various
gradations are related here to the set active power limit of the inverter. If this display is not desired,
switch this function off in accordance with the following procedure. Once this has been done, the
green LED is lit permanently to signalize feed-in operation.
The basic procedure for changing operating parameters is explained in another section (see
Section9.1 "Changing Operating Parameters", page53).
Procedure:
In the parameter group Device > Operation, select the parameter Dynamic power
display via green LED and set this to Off.
9.10 Activating the Receipt of Control Signals (Only for
Italy)
In order for PV systems in Italy to receive control commands from the grid operator, set the
following parameters.
The basic procedure for changing operating parameters is explained in another section (see
Section9.1 "Changing Operating Parameters", page53).
Parameters Value/range Resolution Default
Application ID 0 to 16384 1 16384
GOOSE-Mac address 01:0C:CD:01:00:00 to
01:0C:CD:01:02:00
1 01:0C:CD:01:00:00
Procedure:
1. Select the parameter group External communication > IEC 61850 configuration.
2. In the field Application ID, enter the application ID of the grid operator gateway. You will
receive this value from your grid operator. You can enter a value between 0 and 16384. The
value 16384 indicates "deactivated".
3. In the field GOOSE-Mac address, enter the MAC address of the grid operator gateway
from which the inverter is to receive the control commands. You will receive this value from
your grid operator.
The receipt of control signals from the grid operator is activated.
9Configuration of the Inverter
SMA Solar Technology AG
Operating ManualSB30-50-1AV-40-BE-en-1058
58


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for SMA Sunny Boy 5.0 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of SMA Sunny Boy 5.0 in the language / languages: English as an attachment in your email.

The manual is 2,56 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of SMA Sunny Boy 5.0

SMA Sunny Boy 5.0 User Manual - German - 104 pages

SMA Sunny Boy 5.0 User Manual - Dutch - 102 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info