SMA Solar Technology AG 7 Initial Start-Up
Installation Manual SB13_21TL-IA-en-65 37
7 Initial Start-Up
7.1 Procedure
Before you can commission the inverter, you must check various settings and make any necessary
changes. This section describes the procedure for initial start-up and provides an overview of the steps
that must always be performed in the given sequence.
7.2 Changing the Country Data Set
The inverter is set by default to a specific country data set. You can find the country data set configured
on the inverter in the enclosed supplementary sheet with the default settings. If the configured country
data set does not apply to your country, you will need to change the country data set via a
communication product.
Procedure
1. Check the country data set configuration of
the inverter.
see supplementary sheet with default
settings
Type label or display
2. If the country data set is not correctly
configured for your country or purpose, set it
to the required country data set
(see Section7.2 "Changing the Country
Data Set", page37)
3. Check which configuration of the display
language is set and adjust as necessary.
(see Section7.3 "Changing the Display
Language", page38)
4. Carry out initial commissioning of the inverter
and start self-test, if required.
(see Section7.4 "Commissioning the
Inverter", page39)
and if applicable
(see Section7.5 "For Italy Only: Starting the
Self-test", page40)
Country data set must be correctly configured
If you configure a country data set that is not valid for your country or particular application,
this may cause a plant a disturbance and lead to problems with the network operator.
When selecting the country data set, always observe the locally applicable standards and
directives, as well as the specific plant properties (e.g. plant size, grid-connection point, etc.).
•If you are not sure which country data set is applicable for your country or application,
contact your network operator to clarify the appropriate country data set.
37


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for SMA Sunny Boy 1600TL at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of SMA Sunny Boy 1600TL in the language / languages: English as an attachment in your email.

The manual is 1,66 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of SMA Sunny Boy 1600TL

SMA Sunny Boy 1600TL User Manual - Dutch - 2 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info